My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> TABLE OF CONTENTS <br /> INOTICE TO CONTRACTORS 1 <br /> DIVISION B — BID DESCRIPTIONS 3 <br /> IDIVISION P — PROPOSAL 13 <br /> PROPOSAL SIGNATURE SHEET 18 <br /> SUBCONTRACTORS FORM 20 <br /> I DISADVANTAGED/WOMEN'S BUSINESS ENTERPRISE 22 <br /> NON-COLLUSTION AFFIDAVIT 24 <br /> BID DEPOSIT 26 <br /> IDIVISION C — CONTRACT 29 <br /> PAYMENT BOND 33 <br /> PERFORMANCE BOND 35 <br /> IDIVISION 1 — GENERAL REQUIREMENTS 37 <br /> General Description and Location of Project (******) 37 <br /> Design Engineer (******) 37 <br /> IStandard Specifications (******) 37 <br /> 1-01 DEFINITIONS AND TERMS 38 <br /> 1-02 BID PROCEDURES AND CONDITIONS 42 <br /> I 1-03 AWARD AND EXECUTION OF CONTRACT 48 <br /> 1-04 SCOPE OF THE WORK 50 <br /> 1-05 CONTROL OF WORK 56 <br /> I 1-06 CONTROL OF MATERIAL 72 <br /> 1 07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 74 <br /> 1 08 PROSECUTION AND PROGRESS 90 <br /> 1-09 MEASUREMENT AND PAYMENT 108 <br /> I 1-10 TEMPORARY TRAFFIC CONTROL 127 <br /> 1 11 MISCELLANEOUS (******) 131 <br /> DIVISION 2 — EARTHWORK 133 <br /> 1 2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP 133 <br /> 2 02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 133 <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT 136 <br /> I 2-04 HAUL 138 <br /> 2 07 WATERING X39 <br /> 2-08 STREET CLEANING (******) 139 <br /> I 2-09 STRUCTURE EXCAVATION 140 <br /> 2 11 TRIMMING AND CLEANUP 141 <br /> DIVISION 4 — BASES 143 <br /> I 4-04 BALLAST AND CRUSHED SURFACING 143 <br /> 4 06 ASPHALT TREATED BASE 143 <br /> DIVISION 5 — SURFACE TREATMENTS AND PAVEMENTS 145 <br /> I 5-04 HOT MIX ASPHALT 145 <br /> 5 06 PAVEMENT PATCHING (******) 149 <br /> I <br /> Alverson Stormwater Separation Table of Contents February, 2019 <br /> I WO No—UP3660 SP-i <br />
The URL can be used to link to this page
Your browser does not support the video tag.