My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 7 - DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, WATER <br /> MAINS, AND CONDUITS 153 1 <br /> 7-04 STORM SEWERS 153 <br /> 7-05 MANHOLES, INLETS AND CATCH BASINS 154 <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 157 ' <br /> 7-18 SIDE SEWERS 160 <br /> 7-19 SEWER CLEANOUTS 162 <br /> DIVISION 8 - MISCELLANEOUS CONSTRUCTION 163 <br /> 8-01 EROSION CONTROL 163 <br /> 8-02 ROADSIDE RESTORATION 165 <br /> 8-04 CURBS, GUTTERS AND SPILLWAYS 167 <br /> 8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES 168 <br /> 8-13 MONUMENT CASES 169 <br /> 8-14 CEMENT CONCRETE SIDEWALKS 170 <br /> 8-21 PERMANENT SIGNING 172 <br /> 8-22 PAVEMENT MARKING 173 <br /> DIVISION 9 - MATERIALS 175 <br /> 9-03 AGGREGATES 175 <br /> 9-04 JOINTS AND CRACK SEALING MATERIALS 175 <br /> 9-05 DRAINAGE STRUCTURES, CULVERTS, AND CONDUITS 175 <br /> III <br /> 9-14 EROSION CONTROL AND ROADSIDE PLANTING 176 <br /> 9-23 CONCRETE CURING MATERIALS AND ADMIXTURES 178 <br /> APPENDIX A- BORING LOGS I <br /> APPENDIX B - CITY OF EVERETT STANDARD DRAWINGS <br /> APPENDIX C - CHANGE ORDER FORMS <br /> I <br /> APPENDIX D - PUGET SOUND CLEAN AIR AGENCY - EXCERPTS OF AIR QUALITY <br /> RULES <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> Alverson Stormwater Separation Table of Contents February, 2019 <br /> WO No—UP3660 SP -ii <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.