My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 5. Signature of the Bidder's officer empowered to sign official statements. The <br /> signature of the person authorized to submit the Bid should agree with the <br /> signature on the bond, and the title of the person must accompany the said <br /> signature; <br /> 6. The signature of the surety's officer empowered to sign the bond and the <br /> power of attorney. <br /> Bidder shall use the bond form included in the Bid Documents. <br /> 1-02.8 Noncollusion Declaration and Lobbying Certification I <br /> 1-02.8(1) Noncollusion Declaration <br /> Delete the last paragraph of 1-02.8(1) and supplement by adding the following: <br /> The City has determined every Bidder must submit a Non-Collusion Affidavit for <br /> every Project. Accordingly, the Bidder shall submit a "Non-Collusion Affidavit", <br /> contained in the Contract Documents, as part of the Proposal package. If the City <br /> has reason to believe that collusion exists among Bidders, the City will reject the I <br /> Bids of the known participants in such collusion and may, at its option, require that <br /> all Bidders certify under penalty of perjury, that no collusion has occurred or exists. <br /> 1-02.9 Delivery of Proposal I <br /> Delete all of 1-02.9 and substitute the following: <br /> Bidder shall submit Bidder's Proposal in a sealed opaque envelope that clearly and <br /> legibly notes the Project Name, the time and date of the bid opening, and the Bidder's <br /> name and address on the outside of the envelope. <br /> The City will not open or consider any Proposal or any supplement to a Proposal that <br /> is received after the time specified for receipt of Proposals, or received in a location <br /> other than that specified for receipt of Proposals. <br /> 1-02.10 Withdrawing, Revising, or Supplementing Proposal <br /> Delete 1-02.10 and substitute with the following: <br /> After submitting a physical Bid Proposal to the City, the Bidder may withdraw, revise, or <br /> supplement it if: <br /> 1. The Bidder submits a written request signed by an authorized person, and <br /> physically delivers it to the place designated for receipt of Bid Proposals, and <br /> 2. The City receives the request before the time set for receipt of Bid Proposals, <br /> and <br /> 3. The revised or supplemented Bid Proposal (if any) is received by the City <br /> before the time set for receipt of Bid Proposals. <br /> The original physical Bid Proposal may be supplemented, or revised and resubmitted <br /> as the official Bid Proposal if the City receives it before the time set for receipt of <br /> Proposals. Email, fax or telephone requests to withdraw, revise, or supplement a <br /> Proposal are not acceptable. If the Bidder does not submit a revised or supplemented <br /> package in time, then its bid shall be considered withdrawn. <br /> Resubmitted Proposals shall be in full compliance with the bidding requirements. Bid <br /> deposit shall be in an amount sufficient for the Proposal as resubmitted. <br /> After the scheduled time for opening Proposals, no Bidder will be permitted to withdraw <br /> his Proposal unless the award of contract is delayed for a period exceeding 45 <br /> calendar days. Proposals received after the scheduled closing for opening Proposals <br /> will be returned unopened to the Bidder. <br /> Alverson Stormwater Separation February, 2019 <br /> WO No—UP3660 Division 1 —GENERAL REQUIREMENTS <br /> SP-46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.