My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERE T T SPECIAL PROVISIONS <br /> 1-02.12 Public Opening of Proposals <br /> ' Supplement 1-02.12 by adding the following: <br /> 1-02.12(1) Postponement of Opening <br /> (******) <br /> ' The City reserves the right to postpone the date and time for receiving or opening of <br /> Bids, or both, at any time prior to the date and time established in the Notice to <br /> Bidders. Postponement notices shall be provided to Bidders in the form of addenda. <br /> ' 1-02.13 Irregular Proposals <br /> Revise item 1 and 2 of 1-02.13 to read as follows: <br /> 1. A Proposal will be considered irregular and will be rejected if: <br /> a. The Bidder is not prequalified when so required; <br /> b. The authorized proposal form furnished by the City is not used or is altered; <br /> c. The completed proposal form contains any unauthorized additions, deletions, <br /> alternate Bids, or conditions; <br /> d. The Bidder adds provisions reserving the right to reject or accept the Award, <br /> or enter into the Contract; <br /> e. A price per unit cannot be determined from the Bid Proposal; <br /> f. The Proposal form is not properly executed; <br /> ' g. The Bidder fails to submit or properly complete a Subcontractor list, if <br /> applicable, as required in 1-02.6; <br /> h. The Bidder fails to submit or properly complete a Disadvantaged, Minority or <br /> ' Women's Business Enterprise Certification, as required in 1-02.6; <br /> i. The Bid Proposal does not constitute a definite and unqualified offer to meet <br /> the material terms of the Bid invitation; or <br /> j. More than one proposal is submitted for the same project from a Bidder under <br /> the same or different names. <br /> 2. A Proposal may be considered irregular and may be rejected if: <br /> ' a. The Proposal does not include a unit price for every Bid item; <br /> b. Any of the unit prices are excessively unbalanced (either above or below the <br /> amount of a reasonable Bid) to the potential detriment of the Contracting <br /> 1 Agency: <br /> c. Receipt of Addenda is not acknowledged; <br /> d. A member of a joint venture or partnership and the joint venture or partnership <br /> submit Proposals for the same project (in such an instance, both Bids may be <br /> rejected); or <br /> e. If Proposal form entries are not made in ink. <br /> ' 1-02.14 Disqualification of Bidders <br /> Revise 1-02.14 to read as follows: <br /> ' A Bidder will be deemed not responsible if the Bidder does not meet the mandatory <br /> bidder responsibility criteria in RCW 39.04.350(1), as amended, and noted in 1- <br /> 02.1(1). <br /> The City will verify that the Bidder meets the mandatory bidder responsibility criteria in <br /> RCW 39.04.350(1). To assess bidder responsibility, the City reserves the right to <br /> ' Alverson Stormwater Separation February, 2019 <br /> WO No-UP3660 Division 1 -GENERAL REQUIREMENTS <br /> SP-47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.