My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY Or EVtrtt i i SPECIAL PROVISIONS <br /> 1-04.1(3)B Division of Specifications and Plans <br /> Specifications and Plans are divided into groups for convenience. These divisions <br /> are not for the purpose of apportioning Work or responsibility for Work among <br /> Subcontractors, Suppliers and manufacturers. The Contractor is responsible for <br /> all Work shown or described, regardless of location(s) in the Contract Documents. <br /> ' 1-04.1(3)C Discrepancies in Specifications and Plans <br /> 1-04.1(3)C(1) Errors and Omissions <br /> ' If the Contractor becomes aware of any errors or omissions in the Contract <br /> Documents or in the City's field work, it shall immediately inform the City's <br /> Representative in writing. The City's Representative will promptly review the <br /> matter and if it finds an error or omission has been made; it will determine the <br /> ' corrective actions and advise the Contractor accordingly. If the corrective <br /> work associated with an error or omission increases or decreases the amount <br /> of Work called for in the Contract, the City will issue an appropriate Change <br /> ' Order. After discovery by the Contractor of an error or omission, related Work <br /> performed by the Contractor shall be done at its risk unless authorized by the <br /> City's Representative and approved by the City. <br /> 1-04.1(3)C(2) Conflicting Provisions <br /> In the event an item of Work is described differently in two or more locations <br /> on the Plans, in the Specifications and Special Provisions, the Contractor <br /> ' shall, upon request of the City's Representative, submit in writing to the City's <br /> Representative the description upon which the Contractor relied in preparing <br /> its Bid or laying out the Work. <br /> 1-04.1(3)D Utilities <br /> 1-04.1(3)D(1) General <br /> The City has endeavored to determine the existence of public and private <br /> ' utilities at the site of the Work from the records of the owners of known <br /> utilities in the vicinity of the Work. The positions of these utilities as derived <br /> from such records are shown on the Plans. Unless otherwise noted, no <br /> excavations were made to verify the locations shown for underground utilities. <br /> The service connections to the gas, electric, cable TV and communication <br /> utilities are not shown on the Plans. Refer to 1-07.17 UTILITIES AND <br /> ' SIMILAR FACILITIES regarding Contractor's responsibility for locating and <br /> verifying underground public and private utilities. <br /> 1-04.1(3)D(2) Unknown/Incorrectly Marked Utilities <br /> When a utility interferes with the Work and is either (1) not identified on the <br /> ' Plans or (2) located in a position significantly different from that specified on <br /> the Plans or in accordance with a particular utility's standard depth and <br /> location, Contractor shall follow the procedures of 1-04.7 DIFFERING SITE <br /> ' CONDITIONS (CHANGED CONDITIONS). Interference with the Work is <br /> defined as a utility that crosses or projects into the plane of the Work at an <br /> elevation between the top and bottom of the Work. <br /> ' 1-04.2 Coordination of Contract Documents, Plans, Special Provisions <br /> Specifications, and Addenda <br /> Revise the second paragraph of 1-04.2 to read as follows: <br /> ' Any inconsistency in the parts of the Contract shall be resolved by following this order <br /> of precedence: <br /> ' Alverson Stormwater Separation February, 2019 <br /> WO No-UP3660 Division 1 -GENERAL REQUIREMENTS <br /> SP-51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.