CITY OF EVERETT SPECIAL PROVISIONS <br /> 1. Change Orders, <br /> 2. Addenda, ' <br /> 3. Contract, <br /> 4. Proposal Form, <br /> 5. Special Provisions, <br /> 6. Contract Plans, <br /> 7. City's Standard Drawings (if any) <br /> 8. WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal <br /> Construction, <br /> 9. Amendments to WSDOT Standard Specifications for Road, Bridge, and <br /> Municipal Construction, and <br /> 10. WSDOT/APWA Standard Plans for Road, Bridge and Municipal Construction. <br /> Revise the sixth paragraph of 1.04.2 to read as follows: <br /> In case of any ambiguity or dispute over interpreting the Contract, the Engineer's <br /> decision will be final as provided in 1-05.1 AUTHORITY OF THE ENGINEER. <br /> 1-04.3 Reference Information ' <br /> Revise 1-04.3 to read as follows: <br /> Reference Information provided to the Contractor is not part of the Contract. The City <br /> of Everett does not guarantee the accuracy of the Reference Information and is not <br /> responsible for the content of the Reference Information in any manner. Any use of <br /> Reference Information by the Contractor is done solely at the Contractor's risk. <br /> 1-04.4 Changes 1 <br /> Delete 1-04.4 and substitute the following: <br /> 1-04.4 Changes <br /> 1-04.4(1) City's Right to Direct Changes to the Work <br /> (******) <br /> The City reserves the right to change the Work at any time. Such changes shall not <br /> invalidate the Contract nor release the Surety, and the Contractor agrees to perform <br /> the Work as changed. Among others, these changes and alterations may include: <br /> 1. Deleting or omitting any part of the Work, Equipment or material to be <br /> provided under this Contract. <br /> 2. Increasing or decreasing quantities, <br /> 3. Altering Specifications, designs, or both, <br /> 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> 6. Altering facilities, Equipment, materials. services, or sites, provided by the <br /> City, and <br /> 7. Ordering the Contractor to accelerate or Delay the Work. <br /> If the Contractor and City do not agree upon scope of Work changed or adjustment to <br /> the Contract Sum and Contract Time, the City may, at its sole option, unilaterally direct <br /> the Contractor to implement City directed change by notice. The City shall not pay or <br /> be responsible or liable for changes implemented by the Contractor without explicit <br /> notice from the City to proceed. <br /> Alverson Stormwater Separation February,2019 <br /> WO No—UP3660 Division 1 —GENERAL REQUIREMENTS <br /> SP-52 <br />