Laserfiche WebLink
r <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Representative. The City has the authority to make determinations of the acceptability of <br /> the Work. The City also has the authority to accept or reject the City's Representative's <br /> recommendations regarding retention of defective Work. <br /> 1-05.2 Authority of Assistants and Inspectors <br /> ' Delete 1-05.2 and substitute the following: <br /> 1-05.2 City's Representative <br /> (******) <br /> ' The City's Representative shall be satisfied that all the Work is being done in accordance <br /> with the requirements of the Contract. The Contract and Specifications give the City's <br /> Representative authority over the Work. Whenever it is so provided in this Contract, the <br /> ' decision of the City's Representative shall be final. <br /> The City's Representative's decisions will be final on all questions including, but not limited <br /> to, the following: <br /> 1. Quality and acceptability of materials and Work; <br /> 2. Measurement of Work, whether lump sum, Force Account, or unit price; <br /> 3. Acceptability of rates of progress on the Work; <br /> 4. Interpretation of Plans and Specifications; <br /> 5. Determination as to the existence of changed or differing site conditions; <br /> ' 6. Fulfillment of the Contract by the Contractor: <br /> 7. Payments under the Contract including adjustment; <br /> 8. Suspension(s) of Work; <br /> ' 9. Termination of the Contract for default or public convenience; and <br /> 10. Approval of working or detail Plans and Submittals. <br /> If the Contractor fails to respond promptly to the requirements of the Contract or orders <br /> ' from the City's Representative: <br /> 1. The City's Representative may use the City's resources, other contractors, or other <br /> means to accomplish the Work, and <br /> 2. The City will not be obligated to pay the Contractor, and will deduct from the <br /> Contractor's payments, costs that result when other means are used to carry out <br /> the Contract requirements or City's Representative's orders. <br /> ' At the Contractor's risk, the City's Representative may suspend all or part of the Work if: <br /> 1. The Contractor fails to fulfill Contract terms, to carry out the City's Representative's <br /> orders, or to correct unsafe conditions of any nature; or <br /> 2. It is in the public interest. <br /> The City's Representative and City shall have complete access to the Work and to the site <br /> of the Work and to the places where Work is being prepared or where materials, <br /> Equipment, and machinery are being obtained for the Work. If requested by the City's <br /> Representative or City, the Contractor shall provide the assistance necessary for obtaining <br /> such access, and shall provide information related to the inspection of construction. <br /> ' Absence of such access or information, as needed, may result in the City's refusal to <br /> accept the Work. <br /> The City's Representative has the authority to recommend Change Orders, but does not <br /> ' have authority to approve Change Orders. Proposed Change Orders are subject to review <br /> and approval by the City. No proposed Change Order or any change of Contract Sum or <br /> Alverson Stormwater Separation February, 2019 <br /> WO No—UP3660 Division 1 —GENERAL REQUIREMENTS <br /> SP-57 <br />