Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Contract Time is effective or binding upon the City unless and until the Mayor or its <br /> designee signs it, as authorized by City Council or by ordinance. I <br /> To detail and illustrate the Work, the City's Representative may furnish to the Contractor <br /> additional drawings and explanations consistent with the original Plans. The Contractor <br /> shall perform the Work according to these additional drawings and explanations. <br /> The City's Representative may appoint assistants and inspectors to assist in determining <br /> that the Work and materials meet the Contract requirements. Assistants and inspectors <br /> have the authority to reject defective material and suspend Work that is being done <br /> improperly, subject to the final decisions of the City's Representative or, when appropriate, <br /> the City. <br /> Assistants and inspectors are not authorized to accept Work, to accept materials, to issue <br /> instructions, or to give advice that is contrary to the Contract. Work done or material <br /> furnished that does not meet the Contract requirements shall be at the Contractor's risk and <br /> shall not be a basis for a Contract Claim even if the inspectors or assistants purport to <br /> change the Contract. <br /> Assistants and inspectors may advise the Contractor of any faulty work or materials or <br /> infringements of the terms of the Contract; however, failure of the City's Representative or <br /> the assistants or inspectors to advise the Contractor does not constitute acceptance or <br /> approval. <br /> 1-05.3 Working Drawings <br /> Revise the second paragraph to read as follows: <br /> Working Drawings will be classified under the following categories: <br /> 1. Type 1 — Submitted for City information. Submittal must be received by the City a <br /> minimum of 7 working days before Work represented by the submittal begins. <br /> 2. Type 2 — Submitted for City review and comment. Unless otherwise stated in the <br /> Contract, the Engineer will require up to 15 working days from the date the Working <br /> Drawing is received until it is returned to the Contractor. The Contractor shall not <br /> proceed with the Work represented by the Working Drawing until comments from the <br /> Engineer have been addressed. <br /> 3. Type 2E — Same as a Type 2 Working Drawing with Engineering as described <br /> below. <br /> 4. Type 3 — Submitted for City review and approval. Unless otherwise stated in the 111Contract, the Engineer will require up to 20 working days from the date the Working <br /> Drawing is received until it is returned to the Contractor. The Contractor shall obtain <br /> the Engineer's written approval before proceeding with the Work represented by the <br /> Working Drawing. I <br /> 5. Type 3E — Same as a Type 3 Working Drawing with Engineering as described <br /> below. <br /> Supplement 1-05.3 as follows: 1 <br /> The Contract Documents include Plans that show such details as are reasonably <br /> necessary to give a comprehensive understanding of the Work. The Contractor shall <br /> submit alterations affecting the requirements and information in the Plans in writing to <br /> the Engineer for approval prior to performing such Work. <br /> The Engineer may supplement the Plans with additional drawings and explanations, <br /> consistent with the purpose and intent of the original Plans, to detail and illustrate the <br /> Work. The Contractor shall perform the Work according to these supplemental <br /> drawings and explanations. <br /> Alverson Stormwater Separation February, 2019 <br /> WO No—UP3660 Division 1 —GENERAL REQUIREMENTS <br /> SP—58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.