My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
State of Washington Department of Ecology 3/28/2019 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2021
>
State of Washington Department of Ecology 3/28/2019 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:44:37 AM
Creation date
5/2/2019 10:44:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
State of Washington Department of Ecology
Approval Date
3/28/2019
Council Approval Date
3/27/2019
End Date
6/30/2021
Department
Public Works
Department Project Manager
Mark Sadler
Subject / Project Title
Everett Landfill Tire Fire Oversight
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of Washington Department of Ecology Page 5 of 10 <br /> CITY OF EVERETT <br /> Everett Landfill Tire Fire Project <br /> Agreement No.TCPRA-2015-EverPW-00012 <br /> Amendment No.2 <br /> 2.1 A report on the development plan for landfill gas collection and <br /> controls. <br /> 22 Operations and Maintenance Plan for the Landfill Gas Collection <br /> System. <br /> 2.3 Construction plans and specifications for cover modifications <br /> 2.4 Construction Quality Assurance Report for landfill cover. <br /> 2.5 Report on review of the developer's foundation and piling plan. <br /> 2.6 Quality assurance plan for pile installation. <br /> CHANGES TO SCOPE OF WORK <br /> Task Number: 3 Task Cost: $0.00 <br /> Task Title: OPERATIONS&MAINT OF LANDFILL GAS SYSTEM J007 <br /> Task Description: <br /> This task funds RECIPIENT eligible costs ECOLOGY deems reasonable and necessary for the maintenance of the <br /> landfill gas control system during the first year following completion of system development under the developed <br /> landfill. RECIPIENT shall ensure proper operations and maintenance of the system is occurring and that the system is <br /> functioning to provide the design protections of the site consistent with the Consent Decree. Eligible costs may <br /> include RECIPIENT training,O&M equipment,and monitors needed during the first year of operation after <br /> construction completion. <br /> Task Goal Statement: <br /> To operate and maintain a landfill gas control system to protect facilities, structures,and public safety at the <br /> redeveloped Everett Landfill site. <br /> Task Expected Outcome: <br /> One year of successful operations at the Everett Landfill site for the landfill gas control systems,including any <br /> troubleshooting and first-year corrections and modifications. <br /> Recipient Task Coordinator: Mark Sadler <br /> Deliverables <br /> Number Description Due Date <br /> 3.1 Monthly monitoring and operations report for the landfill gas <br /> system. <br /> CHANGES TO SCOPE OF WORK <br /> Version 10/30/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.