|
� ABBREVIATIONS GENERAL NOTES NON-STRUCTURAL ELECTRICAL COMPONENT NOTES r�'
<br /> , �� ,
<br /> , �
<br /> A AMPERE 1. PERFORM WORK IN ACCORDANCE WITH APPLICABLE NATIONAL AND 1. THE COMPONENT IMPORTANCE FACTOR (Ip) FOR ALL � �
<br /> ° AC AIR CONDITIONING; ALTERNATING CURRENT MC MAIN CROSS CONNECT; METAL CLAD (CABLE} STATE CODES AS AMENDED LOCALLY AND ENFORCED E3Y THE AHJ. NON-STRUCTURAL COMPONENTS SHALL BE: ��
<br /> �w
<br /> � AF AMP FRAME MCC MOTOR CONTROL CENTER �`�
<br /> AF AMP FUSE; AMP FRAME MCB MAIN CIRCUIT BREAKER 2• OBTAIN AND PAY FOR PERMITS REQUIRED FOR INSTALLATION OF Ip = 1.5 •�
<br /> AFF ABOVE FINISHED FLOOR MDF MAIN DISTRIBUTION FRAME WORK. ARRANGE AND SCHEDULE REQUIRED INSPECTIDNS. �` �
<br /> , � 2. THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM THE 2012 �,� �
<br /> AG ABOVE GRADE M�P MAIN DISTRIBUTION PANEL 3. COORDINATE WITH UTILITY GOMPANIES FURNISHING SERVICES TO INTERf�aATIOiVAL BUILDING CODE AND FROM THE AMERICAN SOCIETY L��� ,��J�J�,� , � �}� r.��`- '
<br /> AHJ AUTHORITIES HAVING JURISDICTION MFR MANUFACTURER PROJECT. INSTALLATION OF UTILITY SERVICES SHAL� BE IN OF CIVIL ENGINEERS (ASCE) STANDARD 7-05. TH!= CONTRACTOR �.��`�,_�r, ,s,.��_` ;j�1��
<br /> AHU AIR HANDLING UNIT MH MANHOLE ACCORDANCE WITH UTILITY REQUIREMENTS. VERIFY APPLICABLE SHALL REFER TO THE ABOVE FOR ADDITIONAL INr=ORMATION, �,;�n.�� a� � 1� ��i� '
<br /> AIC AMPERE INTERRUPTINC CURRENT MW MINIMUM ' INSTALLATIOf� STANDARDS AND REQUIREMENTS. PROVIDE AND EXCEPTIONS, AND FURTHER DESCRIPTIONS. THE CONTRACTOR �--ry�, rt�, j� i ���;g '
<br /> AL ALUMINUM MLO MAIN LUGS ONLY SUBMIT ELECTRICAL DRAWINGS TO UTILITY FOR APPROVAL PRIOR TO SHALL ADHERE TO REQUIREMENTS AND AS SUCH, SHI�LL BE
<br /> ANSI AMERICAN NATIONAL STANDARDS INSTITUTE MM MULTIMODE ROUGH-IN AND PRIOR TO ORDERING EC�UIPMENT. INCLUDED WITHIN BID. ALSO REFER TO SPECIFICATIONS.
<br /> AS AMP SWITCH MPOE MAIN POINT OF ENTRY 4. DRAWINGS�ARE DIAGRAMMATIC IN NATURE. PROVIDE COMPONENTS 3. 2012 IBC, 1613.1, SCOPE: ARCHITECTURAL, MECHANICAL, ELECTRICAL, � � � � ' �
<br /> AT AMP TRIP MPOP MAIN POINT OF PRESENCE AS REQUIRED FOR A COMPLETE OPERATIONAL SYSTEM WHETHER OR AND NON-STRUCTURAL COMPONENTS THAT ARE PERMANENTLY
<br /> ATS AUTOMATIC TRANSFER SWITCH MTD MOUNTED NOT SPECIFICALLY SHOWN ON THE DRAWINGS. ATTACHED TO STRUCTURES AND THEIR SUPPORTS AND Hargis Engineers,Inc. '
<br /> ATM ASYNCHRONOUS TRANSFER MODE MTS MANUAL TRANSFER SWITCH ATTACHMENTS SHALL BE DESIGNED AN� CONSTRUCTED TO RESIST 12a1 Third Avenue,Suite 600 ',
<br /> ' AV AUDIO VISUAL N NEUTRAL
<br /> 5. DEVICE LOCATIONS ARE APPROXIMATE. COORDINATE DEVICE THE EFFECTS OF EARTHQUAKE MOTIONS IN ACCORDANCE WITH �����WA 98101
<br /> � ' AWG AMERICAN WIRE GAUGE (N) NEW LOCATIONS AND ELEVATIONS WITH APPROPRIATE DOCUMENTS ASCE 7-05, EXCLUDING CHAPTER 14 AND APPENDIX 11A. t� 206.448.3376 I
<br /> INCLUDING��CASEWORK SHOP DRAWINGS AND ARCHITECT'S INTERIOR f� 206.448.4450 I,
<br /> , � BAS BUILDING AUTOMATION SYSTEM NAC NOTIFICATION APPLIANCE CIRCUIT ELEVATIONS PRIOR TO RUUGH-IN. 4. 2012 IBC 1706.1 CONTRACTOR RESPONSIBILITY: THE CONTRACTOR w( hargis.biz '
<br /> ' e BATT BATTERIES NEC NATIONA� ELECTRICAL CODE SHALL BE RESPONSIBLE FOR THE CONSTRUCTION OF A �
<br /> BKBD BACKBOARD NEMA �ATIONAL ELECTRICAL MANUFACTURERS 6. COORDINATE E�ECTRICAL WORK WITH THAT OF OTHER TRADES. SEISMIGFORCE-RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM, !
<br /> BIL BASIC IMPU�SE INSULATION LEVEL ASSOCIATION REFER TO MECHANICAL, ARCHITECTURAL, STRUCTURAL, CIVIL, AND OR SEISMIC-RESISTING COMPONENT LISTED IN THE STATEMENT OF
<br /> BKR BREAKER NF NON FUSED LANDSCAPE DRAWINGS AND SPECIFICATIONS. COORDINATION SHALL SPECIAL INSPECTIONS AND SHALL SUBMIT A WRITTEN STATEMENT OF `
<br /> �� � � ,. �
<br /> � ' NIC NOT IN CONTRAC I� OCCUR PRIOR TO FABRICATION, PURCHASE, AND WSTALLATION OF RESPO�ISIBILITY TO THE BUILDING OFFICIAL AND THE OWNER PRIOR �,�.., '`+'� !�
<br /> , BLDG BUILDING �; �-�.,. �
<br /> NL NIGHT LIGHT WORK. TO THE COMMENCEMENT OF WORI� ON THE SYSTEM OR COMPONENT. z� ``--� '� ' `�
<br /> � CONDUIT;DEGREES CELSIUS THE CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL INCLUDE �� �
<br /> OS OCCUPANCY SENSOR � ` , � �
<br /> CAB CABINET 1 :: --_
<br /> 7. COORDINATE LOCATION OF LIGHT FIXTURES AND CEILING MOUNTED THE FOLLOWING: ''� �
<br /> OFC OPTICAL FIBER CABLE ' ��"
<br /> CATV COMMUNITY ANTENNA TELEVISION OHL OVERHEAD LINE ELEVATIONS. A. ACKNOWLEDGMENT OF AWARENESS OF THE SPECIAL ., g :' �
<br /> CAT CATEGORY DEVICES WITH ARCHITECTURAL REFLECTED CEILWG PLANS AND �i
<br /> s
<br /> OL OVERLOAD REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL °'
<br /> CB CIRCUIT BREAKER ; ` �
<br /> CCTV CLOSED CIRCUIT TELEVISION OSP OUTSIDE PLANT 8. PROVIDE RATED ENCLOSURES AROUND ALL LIGHT FIXTURES INSPECTIONS;
<br /> PENETRATING RATED CEILINGS. COORDINATE WITH ARCHITECTURAL. B. ACKNOWLEDGMENT THAT CONTROL WILL BE EXERCISED TO
<br /> CLG CEILING P POLE , J
<br /> OBTAW CONFORMANCE WITH THE CONSTRUCTION
<br /> CO CONDUIT ONLY PBX PRIVATE BRANCH EXCHANGE ' Q
<br /> PF POWER FACTOR g• tREFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR DOCUMENTS APPROVED BY THE BUILDING OFFICIAL;
<br /> CT CURRENT TRANSFORMER LOCATIONS OF EXPANSION/SEISMIC JOINTS. PROVIDE RACEWAY . C. PROCEDURES FOR EXERCISING CONTROL WITH(N THE �
<br /> CU COPPER PH PHASE EXPANSION/SEISMIC JOINTS FOR RACEWAYS CROSSING BUILDING � CONTRACTOR'S ORGANIZATION, THE METHOD AND � E-
<br /> DDC DIRECT DIGITAL CONTROL PIR PASSIVE INFRARED EXPANSION/SEISMIC JOINTS. FREQUENCY OF REPORTING AND THE DISTRIBUTION OF THE Z � �
<br /> DEMARC DEMARCATION POINT PIV POST INDICATING VALVE � . _: REPORTS; 0 � �--
<br /> PNL PANEL 10. DEMOLISH EXISTING SYSTEMS AS INDICATED ON PLANS OR AS D. IDENTIFICATION AND QUALIFICATIONS OF THE PERSON(S) �
<br /> DISC DISCONNECT � Q
<br /> REQUIRED FOR INSTALLATION OF NEW WORK. MATERIAL SHALL BE EXERCISING SUCH CONTROL AND THEIR POSITION(S) IN THE > z a
<br /> DIST DISTRIBUTION PP PATCH PANEL � W
<br /> REMOVED FROM SITE AND LEGALLY DISPOSED OF OFF SITE UNLESS ORGANIZATION. '–' W
<br /> DSL DIGITAL SUBSCRIBER LINE PT POTENTIAL TRANSFORMER _ OTHERWISE DIRECTED. RETURN ITEMS TO OWNER IN EXISTING � � a i
<br /> DWG DRAWING PVC POLYVINYL CHLt�RIDE CONDITION WHEN DIRECTED BY OWNER. 4. DIVISION 26 RESPONSIBILITIES:
<br /> � (E) EXISTING TO REMAIN RCP REFLECTED CEILING PLAN ' � �
<br /> EA EACH REC RECEPTACLE 11. COMPLETION OF WORK SHALL BE EXECUTED IN ACCORDANCE WITH A. HANGERS AND SEISMIC BRACING FOR ELECTRICAL SYSTEMS w � � �k
<br /> REF REFER TO THE PROJECT SCHEDULE. SCHEDULE INSTALLATION WITH OTHER SHALL BE DESIGNED AND SPECIFIED BY DIVISION 26. DIVISION �" cp �
<br /> EF EXHAUST FAN Q � �
<br /> TRADES TO ENSURE PROJECT MILESTONES ARE MET. 26 SHALL REFER TO l"HE ELECTRICAL DRAWINGS FOR
<br /> EIA ELECTRONIC INDtJSTRIES ASSOCIATION REV REVISION 0 d' �
<br /> Rf�� ROOM � LOCATIONS OF EQUIPMENT AND ELECTRICAL SYSTEMS AS
<br /> ELEV ELEVATION STRUCTURAL DRAWINGS DO NOT SHOW THE LOCATIONS OF �
<br /> EM EMERGENCY RU RACK UNIT ', ELECTRICAL EQUIPMENT, RACEWAYS, AND OTHER �Z
<br /> � EMT ELECTRICAL METALLIC TUBING SHT 'SHEET ENERGY CODE NOTES COMPONEtvTs.
<br /> ENCL ENCLOSURE SLC SIGNALING LINE GIRCUIT � B. DIVISION 26 SHALL COORDINATE THE SUPPOi�T SYSTEMS AND
<br /> EPM ELECTRONIC POWER METER SM SINGLEMODE I DESIGN LOADS FOR HUNG RACEWAYS AN� OTNER
<br /> SMFC SURFACE MOUNTED OPTICRL FIBER CAEiINET 1. RECORD DRAWWGS: SUBMIT TO THE BUILDING OWNER PER ENERGY ELECTRICAL SYSTEMS (INCLUDING COMBWED MULTIPLE
<br /> - EPO EMERGENCY POWER OFF CODE ENFORCED BY THE LOCAL AHJ. RACEWAY RUNS)WITH THE GENERAL CONTRACTOR AND THE
<br /> EQUIP EQUIPMENT SMR SURFACE METAL f�ACEWAY , STEEL AND WOOD JOIST MANUFACTURERS IN ADDITION TO
<br /> " ETR EXISTING TO REMAIN SONET SYNCHRONOUS OPTICAL NETWORK 2, OPERATION AND MAINTENANCE MANUALS: SUBMIT TO THE BUILDING OTHER TRADES THAT MAY BE IMPACTED. rn � '
<br /> " SP SERVICE r�ROVIDER
<br /> EWC EL.ECTRIC WATER COOLER OWNER PER ENERGY CODE ENFORCED BY THE LOCAL AHJ. V z '
<br /> i + F F U S E; D E G R E E S F A H R E N H E I T SREC SPECIFICATIONS z �
<br /> .. ,
<br /> FA FIRE ALARM SPST SINGLE POLE SINGLE THROW 3. THIS BUILDING AND ITS ENERGY SYSTEMS HAVE BEEN DESIGNED T� H �
<br /> ST SHUNT TRIP COMPLY WITH E�VERGY CODE ENFORCED BY THE LOCAL AHJ. ` c r-- ' .
<br /> FAAP FIRE ALARM ANNUNCIATOR PANEL CONTRACTOR IS RESPONSIB�E FOR CORRECT INSTALLATION OF � G
<br /> FACP FIRE ALARM CONTROL PANEL STP SHIELDED TWISTED PAIR ENERGY CONSERVATION MEASURES. � � � �
<br /> : FBO FURNISHED BY OWNER SVGA SUPER VIDEO GRAPHICS ARRAY � � � � � �
<br /> SW SWITCH � � Z � j
<br /> FURNISHED BY OWNER INSTALLED BY 4. LIGHTING CONTROL SYSTEMS COMMISSIONING AND COMPLETION �
<br /> � FOIC CONTRACTOR SWBD SWITCHBOARD REQUIREMENTS: TEST SYSTEMS TO ENSURE THAT BUILDWG r�j � � O �— I �
<br /> TBB TELECOt�/1MUNICATIONS BONDING BACKBONE SYSTEMS HAVE BEEN INSTALLED AND FUNCTION PROPERLY = � I
<br /> FO10 FURNISHED BY OWNER INSTALLED BY OWNER ' � ° (n � (� I
<br /> TEL TELEPHONE EFFICIENTLY AND CAN BE MAINTAINED IN ACCORDANCE WITH THE
<br /> FSD FIRE SMOKE DAMPER TELCO TELEPHONE COMPANY CONTRACT DOCUMENTS AND OPERATIONAL REQUIREMENTS PER = � � � � �
<br /> � G GROUND ENER�Y CODE ENFORCED BY THE AHJ. REFER TO SPECIFICATIONS 0 �
<br /> TGB TELECOMMUNICATIONS GROUNDING BUSBAR FOR ADDITIONAL COMMISSIONING REQUIREMENTS. . � °'
<br /> GFI GROUND FAULT INTERRUPTER � O ~ �
<br /> GFCI GROUND FAULT CIRCUIT INTERRUPTER TIA TELECOMMUNICATIONS INDUSTRY ASSOCIATION ' � H (,f� �
<br /> GND GROUND TMGB TELECOMMUNICATIONS MAIN_GROUNDING , ; Q ~ I� �
<br /> �
<br /> GRS GALVANIZED RIGID STEEL BUSBAR , � � �
<br /> HC HORIZONTAL CROSS CONNECT TP TAMPER PROOF ', � � �I
<br /> TR TELECOMMUNICATIONS ROOM � O
<br /> HID HIGH INTENSITY DISCHARGE �. Q , _
<br /> HP HORSEPOWER TTB TELEPHONE TERP�IINAL BOARD O � �
<br /> HTR HEATER TV TELEVISION � � � �
<br /> Hz HERTZ TVSS TRANSIENT VOLTAGE SURGE SUPPRESSION '
<br /> IC INTERMEDIATE CROSS CONNECT TYP TYPICAL ' , �
<br /> � IBC INTERNATIONAL BUILDING CODE UG UNDERGROUND , I
<br /> IDF INTERMEDIATE DISTRIBUTION FRAME UL UNDERWRITERS LABORATORIES ',
<br /> " - IEEE INSTITUTE OF ELECTRICAL AND ELECTRONIC UON UNLESS OTHERWISE NOTED
<br /> ENGINEERS UPS UNINTERRUPTIBLE POWER SUPPLY SHEET TITLE:
<br /> IG ISOLATED GROUND UTP UNSHIELDED TWISTED PAIR ` ' ABBREVIATIONS AND �
<br /> �
<br /> IMC INTERMEDIATE META�LIC CONDUIT UV UNIT VENTILATOR G�NERAL NfJTES
<br /> ; ISDN INTEGRATED SERVICES DIGITAL NETW�RK V VO�TS '
<br /> J JUNCTION VA VO�T AMPERES '
<br /> kVA ` KILOVOLT AMPERE VFD VARIABLE FREQUENCY DRIVE � F '
<br /> kW KILOWATT W WATT; WIRE ', '
<br /> KCMIL THOUSAND CIRCULAR MILS W/ WITH ' ��
<br /> KVAR KILOVOLT AMPERE REACTIVE W/O WITHOUT ' � . ,
<br /> LAN LOCAL AREA NETWORK WA °WORKSTATION AREA DATE: 04/08/16
<br /> , � , LCP LIGHTING CONTROL PANEL WAN WIDE AREA NETWORK
<br /> LEC LOCAL EXCHANGE CARRIER WG WIRE GUARD �
<br /> JOB NO.: 14008
<br /> LT LIGHT WH WATT HOUR METER •
<br /> LTG LIGHTING WP WEATHERPROOF ' �■�■� �
<br /> M METE'R XMFR TRANSFORMER � ONE INCH AT FU�L SCALE. ;
<br /> MAN METROPOLITAN AREA NETWORK Y WYE ' IF NOT, SCALE ACCORDINGLY
<br /> MAX MAXIMUM Z IMPEDANCE f ' ' SHEET:
<br /> ■
<br /> J - SHEET 57 OF 95 �
<br /> ; � ,
<br />
|