INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
>
Contracts
>
Capital Contract
>
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2019 9:58:06 AM
Creation date
5/3/2019 9:57:55 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
INTERWEST CONSTRUCTION INC.
Approval Date
3/26/2019
Department
Public Works
Department Project Manager
HEATHER GRIFFIN
Subject / Project Title
GRAND AVENUE PARK BRIDGE
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
10
Tracking Number
0000801
Total Compensation
$135,096.44
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST <br /> CONSTRUCTION <br /> INC. <br /> February 22"d,2019 COP 015 REV1 <br /> Ken Kettel,Resident Engineer <br /> KBA/City of Everett <br /> 3101 Cedar Street <br /> Everett,WA 98201 <br /> RE: COP 015:LO1 Fixture Change and System Revisions-REVISED <br /> Grand Ave Pedestrian Bridge/PW 3588 <br /> Dear Ken: <br /> Interwest Construction,Inc. (Interwest)is providing this revised Change Order Proposal(COP)as <br /> discussed to propose a revised LO1 rail light system with changed fixtures and associated system <br /> revisions. Interwest does not believe the original Plans for the rail lighting system was clear enough <br /> to show how the system was to be installed. In attempting to clarify the designed system,it became <br /> apparent LED technology has advanced in the years since the Plans were assembled,and the system <br /> specified may no longer be the best system for this application. In addition to technology <br /> advancements,members of the City's project team verified that the specified LO1 system may be <br /> prone to maintenance issues further detracting from the Plan system. <br /> Through multiple meetings and iterations since early 2018,Interwest and our subcontractor Electric <br /> West have worked with the City's Resident Engineer,Electrical Engineer,and Architect as well as <br /> multiple vendors to re-design the rail lighting system around updated LO1 LED fixtures. The new <br /> system addressed by this proposal fully replaces the current design and creates a complete, <br /> functional system with durable fixtures,dimmable zones,and custom mounting to address aesthetic <br /> requirements of the installation. This process has been lengthy, intensive, and required <br /> considerable efforts on the part of Interwest and Electric West to address nuances of this system <br /> not covered by the Plans or City's Engineer. Interwest and Electric West believe the requested <br /> markups are commensurate with the invested level of effort. <br /> Interwest proposes to provide additional labor,equipment,and materials as detailed below to <br /> address the added work requested: <br /> • Supply and install BOCA HPNFC-HO LO1 LED fixtures instead of LED tape light. The <br /> proposal attached includes 1,350 LF of LO1 fixtures shown on E1.01 to E1.03. <br /> o Additional footage up to 200 LF may be added at the per LF material cost listed <br /> below. If added, Interwest will forgo Prime Contractor's markup on additional <br /> footage as there will be little required of Interwest for such added work. See <br /> Clarifications below. <br /> • Supply and install of Creston Control panel to incorporate all revisions. <br /> • Changes per Stantec revised Plan sheets dated 8/8/2018 <br /> • Other work as specified in Electric West Change Order Proposal(included) <br /> Interwest's proposed price includes the following clarifications: <br /> • This proposal replaces COP 015 rev 0 Dated December 27,2018 in its entirety. <br /> 609 N.Hill Blvd.I Burlington,WA 98233 <br /> www.interwest.biz <br /> Ph: (360)757-7574 Fax:(360)757-7574 <br /> Contractor License INTERCII21OF <br /> 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.