Laserfiche WebLink
Project:_Water Main Replacement Q Evergreen <br /> Way Rebid <br /> Change Order No. 001 <br /> Change Order Effective Date: <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. The amount of the change order for the changes described in Exhibit A,represents <br /> complete compensation for the changes described in Exhibit A,including all direct and <br /> indirect costs and impacts.The contract price shall be adjusted as described in this <br /> Change Order. With respect to Washington State sales tax,the amount of the change <br /> order includes such tax unless the box for"exclusive of Wash.State Sales Tax" is <br /> checked on the preceding page. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work.In <br /> calculating such threshold amounts,Washington State sales tax,if applicable to the <br /> Work,has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to,this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order,including, but <br /> not limited to, claims for equitable adjustment of time and compensation,delay,impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition,protest,dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> Attest: Approved As to Form: <br /> A <br /> 0111°111111111 —PF <br /> yor ,/ l( l�eat �-eriC City Attorn- <br /> Date: ' L�GG <br /> ate: It � �a -• • <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) • splicable) <br /> 3r"ki_..e4e;OL de,"4.101111i 41, //' <br /> Page 2 of 5 <br />