My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV CONSTRUCTION 4/11/2019 Change Order 1
>
Contracts
>
Capital Contract
>
SRV CONSTRUCTION 4/11/2019 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2019 10:14:50 AM
Creation date
5/3/2019 10:14:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV CONSTRUCTION
Approval Date
4/11/2019
Department
Public Works
Department Project Manager
RICHARD HEFTI
Subject / Project Title
WATER MAIN REPLACEMENT "Q' EVERGREEN WAY
Public Works WO Number
UP3612
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0001180
Total Compensation
$180,445.32
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV Construction Company 5/1/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project-Water Main Replacement Q Evergreen Way Rebid <br /> Change Order No. 001 <br /> Change Order Effective Date: March 1, 2019 <br /> Date: I-4-1'f Date: Date: Date: <br /> CONTRACTOR si v • .. 1 I �T7 � 1C�:i <br /> By ,`I*1� Date: 9 1 116t <br /> "� <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> This Change Order# 1 modifies eight(8) existing bid items and adds three (3)new items. <br /> Revised Existing Bid Items <br /> Bid Item 4-Traffic Control Labor.Modify bid item 4 entitled"Traffic Control Labor",to increase <br /> contract value at unit price of$61.00 per HR, by adding 1,000 HR, resulting in a$61,000.00 increase <br /> to the contract. <br /> Bid Item 13-Foundation Material. Modify bid item 13 entitled"Foundation Material",to reduce <br /> contract value at unit price of$55.00 per TN, by removing 470 TN,resulting in a$25,850.00 decrease <br /> to the contract. <br /> Bid Item 14-Gravel Borrow. Modify bid item 14 entitled"Gravel Borrow",to increase contract value <br /> at unit price of$27.00 per TN, by adding 500 TN, resulting in a$13,500.00 increase to the contract. <br /> Bid Item 27-Water Service 1-inch. Modify bid item 27 entitled "Water Service 1-inch",to increase <br /> contract value at unit price of$267.00 per LF, by adding 50 LF,resulting in a $13,350.00 increase to <br /> the contract. <br /> Bid Item 32-Cement Concrete Pavement Base.Modify bid item 32 entitled"Cement Concrete <br /> Pavement Base",to reduce contract value at unit price of$135.50 per SY, by removing 110 SY, <br /> resulting in a$14,905.00 decrease to the contract. <br /> Bid Item 33-1IMA CL'/:" PG 64-22 Permanent Pavement Patch. Modify bid item 33 entitled <br /> "HMA CL %2"PG 64-22 Permanent Pavement Patch", to increase contract value at unit price of <br /> $178.75 per TN, by adding 280 TN, resulting in a$50,050.00 increase to the contract. <br /> Bid Item 36-Permanent Pavement Marking.Modify bid item 36 entitled "Permanent Pavement <br /> Marking", to reduce contract value at unit price of$7,820.00 per LS, by removing 1 LS, resulting in a <br /> $7,820.00 decrease to the contract. <br /> Bid Item 38–Vehicle Loop Detectors. Modify bid item 38 entitled "Vehicle Loop Detectors", to <br /> increase contract value at unit price of$38.00 per LF, by adding 400 LF, resulting in a$15,200.00 <br /> increase to the contract. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.