Laserfiche WebLink
Project - Water Main Replacement Q Evergreen Way Rebid <br /> Change Order No. 001 <br /> Change Order Effective Date: March 1, 2019 <br /> Change Order One Cost Summary <br /> Bid Est. <br /> Item Qnty Unit Unit Price Total <br /> Mod To Existing Bid Items <br /> 4 Traffic Control Labor 1000 hrs 61.00 61,000.00 <br /> 13 Foundation Material -470 tn 55.00 25,850.00 <br /> 14 Gravel Borrow 500 tn 27.00 13,500.00 <br /> 27 Water Service Line 1" 50 If 267.00 13,350.00 <br /> 32 Conc Payment Base -110 SY 135.50 —14,905.00 <br /> 33 Permanent HMA Patch 280 tn 178.75 50,050.00 <br /> 36 Pavement Markings -1 LS 7,820.00 -7,820.00 <br /> 38 Vehicle Loop Detectors 400 If 38.00 15,200.00 <br /> Subtotal Existing Mod 104,525.00 <br /> New Bid Items <br /> 101 Grind 1 LS 26,740.00 26,740.00 <br /> 102 Adjust Valves 20 ea 1,230.00 24,600.00 <br /> 103 Adjust CB's and MH 5 ea 1,695.00 8,475.00 <br /> Subtotal New Bid Items 59,815.00 <br /> Subtotal All Changes 139,940.00 <br /> WSST Allocation 9.8% 16,105.32 <br /> TOTAL Change Order 001 180,445.32 <br /> Page 5 of 5 <br />