My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV CONSTRUCTION 4/11/2019 Change Order 1
>
Contracts
>
Capital Contract
>
SRV CONSTRUCTION 4/11/2019 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2019 10:14:50 AM
Creation date
5/3/2019 10:14:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV CONSTRUCTION
Approval Date
4/11/2019
Department
Public Works
Department Project Manager
RICHARD HEFTI
Subject / Project Title
WATER MAIN REPLACEMENT "Q' EVERGREEN WAY
Public Works WO Number
UP3612
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0001180
Total Compensation
$180,445.32
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV Construction Company 5/1/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project - Water Main Replacement Q Evergreen Way Rebid <br /> Change Order No. 001 <br /> Change Order Effective Date: March 1, 2019 <br /> Change Order One Cost Summary <br /> Bid Est. <br /> Item Qnty Unit Unit Price Total <br /> Mod To Existing Bid Items <br /> 4 Traffic Control Labor 1000 hrs 61.00 61,000.00 <br /> 13 Foundation Material -470 tn 55.00 25,850.00 <br /> 14 Gravel Borrow 500 tn 27.00 13,500.00 <br /> 27 Water Service Line 1" 50 If 267.00 13,350.00 <br /> 32 Conc Payment Base -110 SY 135.50 —14,905.00 <br /> 33 Permanent HMA Patch 280 tn 178.75 50,050.00 <br /> 36 Pavement Markings -1 LS 7,820.00 -7,820.00 <br /> 38 Vehicle Loop Detectors 400 If 38.00 15,200.00 <br /> Subtotal Existing Mod 104,525.00 <br /> New Bid Items <br /> 101 Grind 1 LS 26,740.00 26,740.00 <br /> 102 Adjust Valves 20 ea 1,230.00 24,600.00 <br /> 103 Adjust CB's and MH 5 ea 1,695.00 8,475.00 <br /> Subtotal New Bid Items 59,815.00 <br /> Subtotal All Changes 139,940.00 <br /> WSST Allocation 9.8% 16,105.32 <br /> TOTAL Change Order 001 180,445.32 <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.