My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County 4/29/2019
>
Contracts
>
6 Years Then Destroy
>
2023
>
Snohomish County 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 9:56:18 AM
Creation date
5/9/2019 9:56:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
4/29/2019
Council Approval Date
4/17/2019
End Date
10/31/2023
Department
Public Works
Department Project Manager
Mark Sadler
Subject / Project Title
Smith Island Pump Station O & M
Tracking Number
0001756
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Operations/Maintenance: Snohomish County Surface Water Pump Station I Page 2 of 2 <br /> Labor&Equipment <br /> Personnel: One to two TSG UMTs <br /> Vehicles: Fully equipped service truck <br /> Equipment: Tools on service truck and station logbook (at station) <br /> Time: Daily station checks three times per week, each one hour <br /> Bimonthly emergency generator inspection &testing, each one hour <br /> Annual preventive maintenance,four hours <br /> Annual emergency load banking,five hours <br /> Health &Safety Precautions: <br /> • Before work, consider and implement all traffic control as needed <br /> • Staff must conform to appropriate PPE guidelines. <br /> • Hearing protection will be work when the generator is running. <br /> • There are no Lock Out/Tag Out procedure associated with daily checks. <br /> • There is no live work associated with these tasks. <br /> Environmental Issues: <br /> Procedure prevents pond from overflowing. <br /> Procedure: <br /> 1. Notify dispatch that you will be performing the specific task at the Snohomish <br /> County water surface-water pump station. <br /> 2. Perform task in compliance with existing, specific standard operating procedures: <br /> a. Daily checks,three times per week,follow SOP in station logbook <br /> b. Bimonthly Emergency Generator Inspection &Testing,SOP#TBD <br /> c. Annual preventive maintenance, follow SOPS in station logbook <br /> d. Annual Emergency Generator Load Banking, SOP#TBD <br /> Work Completion and Reporting <br /> All tasks performed are documented using checklists stored in the station logbook. <br /> References and Related Documents: <br /> Forms or checklists(include the Confined Space Form if relevant) <br /> Romtec Utilities Operation & Maintenance Manual: Smith Island Drainage, dated 10-24- <br /> 2017 (Revision 1) https://www.dropbox.com/sh/54bfht5hhka26u2/AACb-FKVgdVDEg1Ai- <br /> waD Ra?dI=0 <br /> Revision History: <br /> Revision Date Author Description of Change <br /> 1 <br /> 2 <br /> PW:SOP PH,TSG, R0-2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.