My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County 4/29/2019
>
Contracts
>
6 Years Then Destroy
>
2023
>
Snohomish County 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 9:56:18 AM
Creation date
5/9/2019 9:56:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
4/29/2019
Council Approval Date
4/17/2019
End Date
10/31/2023
Department
Public Works
Department Project Manager
Mark Sadler
Subject / Project Title
Smith Island Pump Station O & M
Tracking Number
0001756
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I—I 2019 J <br /> Revised date: <br /> Procedures <br /> Preventive Maintenance- 1. Check grounds for litter, debris,and vandalism. <br /> 2. Check structures for damage,graffiti,and debris. <br /> Standard Operating t /i' 3. Run pumps individually in hand. Check pump operation, <br /> Procedure t, _ pump seals leakage, log amps,and run hours. insure <br /> that all pump switches are in the auto when the task is completed. <br /> Equipment Name 4. Look, listen,and smell for anything unusual from equipment. <br /> 5. Check valves for leakage. <br /> 6. Check operation of lighting and exhaust fan. <br /> Preventive Anaintenance Check 7. Touch screen for aiarms. <br /> STATION CHECKS 8. Report any discrepancies to supervisor. <br /> Equipment Location <br /> SWS 1 Snohomish County Surface Water Pump Station <br /> I Number Of I Confined I Lock Out <br /> Periodicity I Personnel flan Hours Space Required <br /> Mon,Wed, Fri 1 .50 NO NO <br /> Parts and Materials Required <br /> TRASH BAGS <br /> Special Equipment Required <br /> NONE <br /> Tools Required <br /> NONE <br /> Ref Tech Manual <br /> For pump operation,reference O&M,Section 3.03 <br /> Safety Cautions <br /> NONE <br /> Related Maintenance <br /> NONE <br /> Coordination Requirements <br /> N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.