My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County 4/29/2019
>
Contracts
>
6 Years Then Destroy
>
2023
>
Snohomish County 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 9:56:18 AM
Creation date
5/9/2019 9:56:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
4/29/2019
Council Approval Date
4/17/2019
End Date
10/31/2023
Department
Public Works
Department Project Manager
Mark Sadler
Subject / Project Title
Smith Island Pump Station O & M
Tracking Number
0001756
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br /> Procedures <br /> 2019 va Open access doors as necessary. <br /> Revised date: Locate Emergency Generator Log Binder. <br /> 1 Follow checklist. <br /> Preventive •Maintenance - APn Perform static checks. <br /> Standard Operating r After static checks are complete,start the test. Locate the test button or <br /> test switch on the transfer switch. Push the test button and hold for <br /> Procedure i 3 seconds,turn the switch to"test"or open the station disconnect to <br /> Equipment Name start the generator. <br /> Perform the running checks as listed on the checklist. <br /> Emergency Generator Allow the generator to run for approximately 10 minutes. <br /> Preventive Maintenance CheckPush and hold the test button for 3 seconds,turn switch to normal,or <br /> close the service disconnect to start the shut down. <br /> 2xMonth) Perform the post running checks. <br /> Generator Run Test <br /> per Close and re-lock all access panels and doors. <br /> Equipment Location <br /> Lift Station SWS #1 <br /> Number Of Confined Lock Out <br /> Periodicity Personnel Man Hours Space Required t " <br /> Bi-Monthly 1 .75 No No <br /> Parts and Materials Required <br /> a i � <br /> Generator Run Checklist Book <br /> Special Equipment Required <br /> None <br /> Tools Required <br /> None <br /> Ref Tech Manual <br /> Ref O&M: 1)Cummins Generator Operation Manual, Section 4.3; i L <br /> 2 C of Everett Generator O. -ration run test SOP <br /> Safety Cautions <br /> Use Standard PPE <br /> Coordination Requirements <br /> Dispatch— Notify Operator <br />
The URL can be used to link to this page
Your browser does not support the video tag.