Snohomish County 4/29/2019
>
Contracts
>
6 Years Then Destroy
>
2023
>
Snohomish County 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 9:56:18 AM
Creation date
5/9/2019 9:56:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
4/29/2019
Council Approval Date
4/17/2019
End Date
10/31/2023
Department
Public Works
Department Project Manager
Mark Sadler
Subject / Project Title
Smith Island Pump Station O & M
Tracking Number
0001756
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
411, Procedures <br /> Cali dispatch and notify them of the load bank work. Turn the generator <br /> HOA switch to off. Switch the main generator breaker to the off position. <br /> Revised date: Remove the load side conductors from the generator main breaker. <br /> Iw I Attach(on 200 amp units)the 3 2/0 pigtails to the load side of the <br /> Preventive. Maintenance - generator main breaker. Phase arrangement is not Important. Attach the <br /> ground lead(marked with green)to the ground lug on the generator. <br /> Standard Operating �" =-r (Note: LS09, LS17, LS19, LS28 and LS32 do not have a neutral on the <br /> Procedure { t ) generator. Turn the main power disconnect off. Connect the neutral <br /> lead to the neutral lug in the station disconnect for LSO9 and LS19. <br /> Equipment Name Connect the neutral conductor in the transfer switch for LS17, LS28, <br /> Emergency Generatorand LS32.) The neutral conductor must be connected for the load bank <br /> Preventive Maintenance Check cooling fan to operate. Turn the station disconnect back on after the <br /> connection is made. Turn all load bank breaks to the off position. <br /> Once the wiring connections are completed,start the generator In hand <br /> Annual Load Banking ! mode. Turn the fan selector to the Internal position. Push the fan <br /> start/failure reset until the fan is running. Reset the load bank main <br /> Equipment Location breaker located on the side of the unit. <br /> Lift Station SWS#1 Select the breaker or breaker combination that will put approximately <br /> 25%of the generator full load capacity and turn them on. Run the unit <br /> Number Of Confined Lock Out for 1 hour at 25%,then add load with additional breakers to 50%for 1 <br /> Periodicity Personnel Man Hours Space Required hour,and finally add load with the breakers for 75%load for 2 hours. <br /> Remove the load to the generator and allow the load bank and generator <br /> Yearly 2 11111111111 No No to cool down before shutting down the generator. <br /> Parts and Materials Required <br /> Ensure that the generator HOA selector switch Is in the off position and <br /> Service Truck& Load Bank SOP Binder the generator main breaker is off. Disconnect the load bank conductors <br /> and re-connect the station load side wiring. Ensure the phases are <br /> Special Equipment Required correct. Turn the generator main breaker on and put the generator <br /> HOA switch into auto. Test the system by using the transfer switch <br /> Simplex Mode/ LB 180-250 test mode or by turning off the main disconnect. <br /> Tools Required <br /> Tee Handle Wrench Set <br /> Ref Tech Manual <br /> City of Everett Generator Load Bank SOP; Load Bank SOP Binder <br /> Safety Cautions <br /> Standard PPE Electrical Safety Awareness <br /> Coordination Requirements - ' <br /> Dispatch i <br /> f <br />