My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County 4/29/2019
>
Contracts
>
6 Years Then Destroy
>
2023
>
Snohomish County 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 9:56:18 AM
Creation date
5/9/2019 9:56:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
4/29/2019
Council Approval Date
4/17/2019
End Date
10/31/2023
Department
Public Works
Department Project Manager
Mark Sadler
Subject / Project Title
Smith Island Pump Station O & M
Tracking Number
0001756
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2019 Procedures <br /> Revised date: Notify Dispatch of station maintenance. <br /> Turn pump HOA switch to the Off position. Switch pump MCC disconnect to <br /> Preventive Maintenance- /� Off position. <br /> Standard Operating � Turn the pump inlet and discharge valves clockwise until closed. The valve <br /> Pe 9 I may have a 2"square nut that requires a 2"valve nut socket and ratchet or <br /> Procedure e l 2"tee handle or the valves may have hand wheels in place. <br /> ` <br /> Turn the inlet and discharge valves counter clockwise until fully open. <br /> Equipment Name When all work is complete,turn the pump MCC disconnect to the On <br /> LIFT STATION INLET AND DISCHARGE VALVES position and turn the HOA selector switch to the Auto. <br /> When all the maintenance is completed, notify Dispatch that the work is done. I` <br /> Preventive Maintennnce Check <br /> EXERCISE PUMP INLET AND DISCHARGE VALVES <br /> Equipment Location <br /> LIFT STATION SWS#1 <br /> Number Of Confined Lock Out <br /> Personnel Man Hour!, Space Required <br /> 6 Months 2 1 HR NO NO <br /> Parts and Materials Required <br /> Special Equipment Required <br /> Took Required <br /> 2'VALVE TEE HANDLE OR 2" SQUARE NUT SOCKET AND RATCHET <br /> Ret Tech Manual <br /> O&M MANUAL, SECTION 3.05 <br /> Safety Cautions <br /> 6 MONTH PUMP LUBRICATION <br /> Coordination Requirements <br /> Dispatch <br />
The URL can be used to link to this page
Your browser does not support the video tag.