My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County 4/29/2019
>
Contracts
>
6 Years Then Destroy
>
2023
>
Snohomish County 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 9:56:18 AM
Creation date
5/9/2019 9:56:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
4/29/2019
Council Approval Date
4/17/2019
End Date
10/31/2023
Department
Public Works
Department Project Manager
Mark Sadler
Subject / Project Title
Smith Island Pump Station O & M
Tracking Number
0001756
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised date: <br /> Procedures <br /> Preventive 'Maintenance - • Notify Dispatch of station maintenance. <br /> Standard Operating • THIS IS A 2 PERSON TASK! 1 qualified electrical technician and 1 <br /> ii <br /> Procedureobserver <br /> as 1 (i • The maintenance technician will wear the proper electrical PPE's. <br /> Equipment N,une • Open the door or cover of the electrical panel being inspected. <br /> • Use the infrared heat gun to look for any hot spots or <br /> ELECTRICAL PANELS connections. <br /> • Use LO/TO procedures to de-energize the panel. <br /> Preventive Maintenance Check • If hot spots are detected,use the insulated tools to ensure the <br /> connections are tight. <br /> ELECTRICAL PANEL INSPECTION AND CLEANING • Use the air blower to remove dust from the panel. <br /> • When work is complete, reinstall panel covers and return <br /> Equipment Location equipment to service. <br /> • This procedure will be repeated for each electrical panel. <br /> SWS1 • All electrical panels inspect and clean to-w transfer switch <br /> Confined Lock Out and generator y; ez <br /> Number Of <br /> Periodic.ty Personnel Man Hours Space Required <br /> _ YEARLY 2 HOURS NO YES <br /> Parts and Materials Required <br /> Special Equipment Required <br /> QUALIFIED ELECTRICAL WORKER/INFRARED HEAT DETtCTOR/ <br /> AIR BLOWER <br /> Tools Required <br /> ELECTRICALLY INSULATED SCREW DRIVERS AND ALLEN HEAD <br /> DRIVERS V.O.M.METER <br /> Ref Tech Manual <br /> Safety Cautions <br /> Related Maintenance <br /> Coordination Requirements <br /> DISPATCH <br /> { <br />
The URL can be used to link to this page
Your browser does not support the video tag.