Laserfiche WebLink
gir Procedures <br /> -_ _ ,, 1. LOTTO pumps Ir <br /> 2f14/19 2. Use service truck crane tope out submersible pumps <br /> Revised date: 3. Use vactor truck pressure washer to clean pumps <br /> 4. inspect pumps,cables,and lifting chains <br /> Preventive' Maintenance- �A 5. Use vactor truck to vacuum out wet well and wash It down ' <br /> 6. Reinstall pumps <br /> Standard Operating 1� 7. Remove LO/TO and test <br /> Procedure �� 8. Notify dispatch and log PM <br /> EquIpment flame <br /> WET WELL <br /> WET WELL CLEANING <br /> Equipment Location <br /> SWS1 <br /> Numi)er Of Confined Lock Out <br /> Periodicity Pet sonnet Ulan Hours Space Required <br /> YEARLY 4 12 HOURS YES <br /> Parts and Materials Required <br /> 1 <br /> Special Equipment Required <br /> VACTOR TRUCK,VACTOR SUPPORT TRUCK,AND TSG SERVICE TRUCK <br /> Too;s Required <br /> SERVICE TRUCK CRANE <br /> Ref Tech Manual <br /> O&M MANUAL <br /> Safety Cautions <br /> LOCK OUT/TAG OUT <br /> Cooiciinatior, Requirements <br /> DISPATCH,SEWER &DRAINAGE,AND TSG <br />