Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF WORK <br /> Grand Avenue Park Bridge <br /> Construction Management and Construction Support <br /> SUPPLEMENT NO. 5 <br /> March 26, 2019 <br /> PROJECT DESCRIPTION <br /> KPFF Consulting Engineers (KPFF) has an agreement with the City of Everett(City)to complete the <br /> Plans, Specifications and Cost Estimate(PS&E), and Construction Management (CM) including full <br /> Construction Support(CS)services for the Grand Avenue Park Bridge. This Supplement No. 5 amends <br /> Supplement No. 3 established for the CM and CS phase of the project, and addresses the cost of the <br /> extended construction schedule. The original Scope of Work was expected to last approximately 16 <br /> months following the Notice to Proceed. However, the proposed construction schedule extends the <br /> approximate construction timeframe an additional 11 months for a total of 27 months. <br /> PROJECT TEAM <br /> This supplement includes effort by the following project team members: <br /> Prime Consultant KPFF <br /> Structural Engineering KPFF <br /> Civil Engineering KPFF <br /> Topographic& Boundary Survey KPFF <br /> Construction Management KBA, Inc. (KBA) <br /> Geotechnical Engineering HWA GeoSciences, Inc. (HWA) <br /> Architectural Services LMN Architects (LMN) <br /> Electrical Engineering Stantec Consulting Services, Inc. (Stantec) <br /> Landscape Architecture City of Everett <br /> Environmental Services Landau Associates (Landau) <br /> Elevator Design The Greenbusch Group, Inc. (Greenbusch) <br /> Mechanical Design Tres West Engineers, Inc. (Tres West) <br /> Combined Sewer& Stormwater HDR, Inc. (HDR) <br /> 1 Page 1 of 4 <br />