Laserfiche WebLink
EXHIBIT G-1 <br /> LMN Architects <br /> CONSULTANT FEE DETERMINATION <br /> SUMMARY OF COST <br /> GRAND AVENUE PARK BRIDGE <br /> PHASE / <br /> Classification Total Hours X Rate = Cost <br /> Partner 0 X $77.88 = $0.00 <br /> Project Designer 140 X $34.86 = $4,880.40 <br /> Specs 0 X $45.91 = $0.00 <br /> X = $0.00 <br /> X = $0.00 <br /> X = $0.00 <br /> X = $0.00 <br /> X = $0.00 <br /> DSC Subtotal $4,880.40 <br /> Overhead (OH) Cost <br /> OH Rate x DSC of 185.00% X $4,880.40 = $9,028.74 <br /> Fixed Fee (FF) <br /> FF Rate x DSC of 30.00% X $4,880.40 = $1,464.12 <br /> Total LMN Labor Cost $15,373.26 <br /> Reimbursables <br /> Mileage. <br /> Subtotal $0.00 <br /> I Subconsultant Total: $15,373.26 <br /> 10/17/2018 lccrff <br />