EXHIBIT 1 TO ORDINANCE <br /> ATTACHMENT I <br /> SECOND AMENDMENT TO DEVELOPMENT AGREEMENT <br /> EVERETT RIVERFRONT REDEVELOPMENT (LANDFILL) <br /> FEIS MITIGATION REQUIRED <br /> Element of the Environment Action Mitigation is Where found in Resp.Party Implementation <br /> And tied to EIS Documents Time Frame <br /> Mitigation Measure <br /> Earth Resources G: Preloading can be used to mitigate settlement of the refuse Construction on DEIS 4.1.5 RC Building Permits <br /> materials at the landfill site and to mitigate settlement of soft native soils including Landfill/Tire Fire site <br /> peat,silt and organic silt. <br /> Earth Resources H: Pile foundations and stone columns may also be used in areas Construction of any DEIS 4.1.5,DEIS RC Building Permits <br /> of concern and where preloading may not alleviate settlement concerns. structures Appendix B <br /> Earth Resources I: A site-specific construction storm water plan shall be developed Any Construction DEIS 4.1.5 Responsible Grading and <br /> according to the EMC Chapter 14.28 Surface and Storm Drainage,and Washington Activity party doing the Building Permits <br /> State Department of Ecology(Ecology)requirements that can move soil work/project <br /> Earth Resources J: The construction storm water plan shall incorporate the Any Construction DEIS 4.1.5 Responsible Grading and <br /> following basic strategies and elements: a) Schedule/coordinate grading and Activity party doing the Building Permits <br /> construction activities to minimize soil exposure;b)Rapidly vegetate and/or mulch that can move soil work/project <br /> denuded areas; c) Keep runoff velocities low; d) Intercept and direct surface water <br /> to a stabilized discharge outlet; e) Prepare drainage and outlets to accommodate <br /> concentrated or increased runoff;f)Trap sediment on-site utilizing BMPs including: <br /> interceptor swales, straw bale barriers, silt fences, straw mulch among other <br /> methods;g)Inspect and maintain control measures frequently;h)Locate storm water <br /> retention and convenience systems down gradient from areas believed to have <br /> previous soil/groundwater contamination to prevent "soaking" of potentially <br /> hazardous or mobile soils; and i) Maintain and protect critical areas buffers. If <br /> possible,perform critical areas and buffer enhancements,if any are required,prior to <br /> upland construction to establish vegetation and stabilize slopes more completely. <br /> Earth Resources K: BMPs and erosion control measures will be specifically Any Construction DEIS 4.1.5 Responsible Grading and <br /> designed to address the individual causes and sources of erosion and sedimentation. Activity party doing the Building Permits <br /> The construction storm water plan shall include primary and secondary control that can move soil work/project <br /> measures to prevent over-reliance on a single design feature to control erosion and <br /> sedimentation. Monitoring and maintenance shall be conducted on a regular basis <br /> and after all large storm events by qualified personnel. Provisions for modifications <br /> to the erosion control system, based on monitoring and maintenance observations <br /> shall be included in the construction storm water plan. <br /> I-2 <br />