Laserfiche WebLink
EXHIBIT 1 TO ORDINANCE <br /> ATTACHMENT I <br /> SECOND AMENDMENT TO DEVELOPMENT AGREEMENT <br /> EVERETT RIVERFRONT REDEVELOPMENT (LANDFILL) <br /> FEIS MITIGATION REQUIRED <br /> Element of the Environment Action Mitigation is Where found in Resp.Party Implementation <br /> And tied to EIS Documents Time Frame <br /> Mitigation Measure <br /> • Cover all trucks transporting materials, wet materials in trucks, or provide <br /> adequate freeboard(space from the top of the material to the top of the truck <br /> bed),to reduce PM10 emissions and deposition during transport <br /> • Provide wheel washers to remove particulate matter that would otherwise <br /> be carried off-site by vehicles to decrease deposition of particulate matter <br /> on area roadways. <br /> • Remove particulate matter deposited on paved,public roads,sidewalks and <br /> bicycle and pedestrian paths to reduce mud and dust;sweep and wash streets <br /> frequently to reduce emissions <br /> • Cover dirt,gravel and debris piles as needed to reduce dust and wind-blown <br /> debris. <br /> • Communication with residential and other sensitive users during <br /> construction and implementation of a construction management plan could <br /> prevent or minimize the potential for health risk to sensitive individuals. <br /> Air Quality B: The Department of Ecology Consent Decree and Cleanup Action Any Construction DEIS 4.2.5.2 Responsible Any Construction <br /> Plan specify that during Site construction activities dust and odor controls are Activity party doing the Activity <br /> required to prevent migration of materials at levels of concern outside the that exposes buried work/project <br /> construction zone. These measures will include daily cover of any exposed waste waste <br /> and could include localized wetting, application of suppressant foams or use of <br /> temporary cover materials to manage generation of odors <br /> Air Quality C:The project must include prudent building and site design to minimize Development on DEIS and FEIS RC Building permits <br /> odor concerns related to mixed-use development, such as ensuring that restaurant mixed-use portions of Summary tables, <br /> exhaust pipes are not directly adjacent to residential air intakes. the site DEIS 4.2.3.7 <br /> Water Resources AA: All development in the 100-year floodplain or floodway must Any development in the Permit listed in Responsible Shoreline permits, <br /> be in compliance with the City's floodplain regulations. Floodplain Development 100-year floodplain or FEIS permit table party doing the Floodplain <br /> Permits are required. floodway. - work/project development <br /> Fact Sheet page 2. permits <br /> Discussion of <br /> regulations in <br /> 4.3.2.1 <br /> I-4 <br />