Laserfiche WebLink
EXHIBIT 1 TO ORDINANCE <br /> ATTACHMENT I <br /> SECOND AMENDMENT TO DEVELOPMENT AGREEMENT <br /> EVERETT RIVERFRONT REDEVELOPMENT (LANDFILL) <br /> FEIS MITIGATION REQUIRED <br /> Element of the Environment Action Mitigation is Where found in Resp.Party Implementation <br /> And tied to EIS Documents Time Frame <br /> Mitigation Measure <br /> Water Resources A:Not applicable to Landfill <br /> Water Resources B:Not applicable to Landfill <br /> Water Resources C: Additional fill on the Landfill/Tire Fire Site as necessary to Development of the FEIS 4.3.6.1 Responsible Floodplain <br /> ensure structures and adjacent areas are at least 2 feet above the 100-year flood Landfill/Tire Fire Site party doing the development <br /> elevations consistent with the City's floodplain regulations and above the 500 year work/project permits <br /> flood level <br /> Water Resources: All development must comply with Ecology's 2005 Storm water Any construction DEIS 4.4.1 Responsible Any construction <br /> Manual for Western Washington,or the City and State requirements in effect at time activity party doing the activity <br /> of application,whichever is more stringent. work/project <br /> Water Resources D: Employ BMPs in the Ecology Manual to implement an Any Construction DEIS 4.4.7.1 Responsible Any Construction <br /> effective erosion control plan during construction including elements such as a) Activity party doing the Activity <br /> installation of silt fencing, b)maintaining existing vegetated buffers through the use work/project <br /> of high visibility clearing limits fencing, c) storm drain inlet protection d) compost <br /> filter berm.; e)temporary sediment traps;f)reduction of exposed areas through the <br /> use of temporary mulching or covering and construction sequencing <br /> Water Resources E: Provide permanent energy dissipation at outfalls using methods Any Construction DEIS 4.4.7.2 Responsible Any Construction <br /> such as dispersion that creates a wide area of shallow flow,thereby reducing velocity Activity party doing the Activity <br /> and erosive forces or connecting or improving existing stabilized pipe outfalls as work/project <br /> needed. <br /> Water Resources F: blank <br /> Water Resources G: For the landfill, all discharge up to the 6-month storm event Development on DEIS 4.4.4.2 RC Development on <br /> will be .. _. . . - ._ _ . _ _. _ ._' . treated through Landfill Landfill/Tire Fire <br /> developer installed stormwater treatment facilities prior to discharge to the Site <br /> Snohomish River through the City-constructed outfalls. Overflow in excess of the <br /> 6-month storm will be discharged to the Snohomish River in accordance with <br /> Ecology regulations. <br /> Plants and Animals A:Completed Fill of wetlands J,K,M <br /> Plants and Animals B: Complete except for following items, which are related to <br /> boat dock and which are only applicable if dock is built: "To mitigate for additional <br /> impacts related to the proposed public boat amenities, creosote pilings will be <br /> I-5 <br />