My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3674-19
>
Ordinances
>
Ordinance 3674-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2019 10:57:10 AM
Creation date
5/21/2019 10:56:29 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3674-19
Date
5/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 TO ORDINANCE <br /> ATTACHMENT I <br /> SECOND AMENDMENT TO DEVELOPMENT AGREEMENT <br /> EVERETT RIVERFRONT REDEVELOPMENT (LANDFILL) <br /> FEIS MITIGATION REQUIRED <br /> Element of the Environment Action Mitigation is Where found in Resp.Party Implementation <br /> And tied to EIS Documents Time Frame <br /> Mitigation Measure <br /> work/project activities <br /> Plants and Animals M: Truck wash areas for equipment and deliveries(on and off- Construction BA/HMP p 15 Responsible During <br /> site)will be provided party doing the construction <br /> work/project activities <br /> Plants and Animals N: Stockpile and staging locations will be identified and Construction BA/HMP p 15 Responsible During <br /> approved party doing the construction <br /> work/project activities <br /> Plants and Animals 0: Active stockpile areas will be contained within a soil berm Construction BA/HMP p 15 Responsible Public Works <br /> and equipped with erosion control measures, party doing the permits. During <br /> work/project construction <br /> activities <br /> Plants and Animals P: Approved storm water and sediment erosion control plans Construction BA/HMP p 15 Responsible Public Works <br /> will be implemented, inspected daily and maintained properly throughout party doing the permits. During <br /> construction work/project construction <br /> activities <br /> Plants and Animals Q: Fueling areas will be distinctly identified and established Construction BA/HMP p 15 Responsible Public Works <br /> within the construction areas. These locations will be equipped with spill prevention party doing the permits. During <br /> and control devices work/project construction <br /> activities <br /> Plants and Animals R: Adequate materials and procedures will be on site to respond Construction BA/HMP p 15 Responsible During <br /> to unanticipated weather conditions or accidental releases of materials (sediment, party doing the construction <br /> concrete or fuel) work/project activities <br /> Plants and Animals S:Concrete piles for in-water construction elements will be used In-water construction BA/HMP p 15 Responsible Shoreline permits <br /> versus steel piles and all concrete will be fully cured prior to arrival at the site and party doing the During in-water <br /> use of a bubble curtain and a 6-inch-thick piece of wood between the impact hammer work/project construction <br /> and the pile during in-water pile driving activities activities <br /> Plants and Animals T:Floating silt curtains may be necessary to contain sediment During shoreline BA/HMP p 15 Responsible During shoreline <br /> released from shoreline setback activities restoration work party doing the restoration work <br /> work/project <br /> Plants and Animals U: A Spill Prevention, Control and Countermeasures(SPCC) Construction BA/HMP p 16 Responsible Public Works <br /> plan party doing the Permits. During <br /> I-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.