Laserfiche WebLink
EXHIBIT 1 TO ORDINANCE <br /> ATTACHMENT I <br /> SECOND AMENDMENT TO DEVELOPMENT AGREEMENT <br /> EVERETT RIVERFRONT REDEVELOPMENT (LANDFILL) <br /> FEIS MITIGATION REQUIRED <br /> Element of the Environment Action Mitigation is Where found in Resp.Party Implementation <br /> And tied to EIS Documents Time Frame <br /> Mitigation Measure <br /> Installation(long-term recruitment)of native coniferous and deciduous tree species <br /> within the Wetland C (Western Edge) buffer that will increase the potential for <br /> continued LWD recruitment into Wetland C. i)Buffers shall be provided as shown <br /> in Attachment X,Y(Figures 14-14C in FEIS). The average 40 foot slope along the <br /> landfill must be vegetated with native herb and shrub buffer vegetation. <br /> Plants and Animals E: Not applicable to Landfill <br /> Plants and Animals F: Not applicable to Landfill <br /> Plants and Animals G: Not applicable to Landfill <br /> Plants and Animals H: Construction BMPS for erosion control such as silt fencing, Construction FEIS 4.5.4.3 Responsible Public Works <br /> mulch berms and erosion control matting,used where appropriate during all aspects party doing the permits,During <br /> of the project to control sedimentation and erosion impacts to animals. work/project construction <br /> activities near <br /> buffers,streams, <br /> wetland or River <br /> Plants and Animals I: Minimize disturbance to animals by consolidating use of Construction FEIS 4.5.4.3 Responsible Shoreline permits, <br /> heavy equipment to shortest times allowable,staging equipment away from sensitive party doing the Public Works <br /> areas, avoid storing debris or supplies in or along shoreline or wetlands, use work/project permits. During <br /> critical/sensitive area signage and fencing to define limits of construction and construction <br /> identify sensitive areas, conducting work in wetlands and streams during dry periods activities near <br /> and/or during established work windows, direct security lighting for construction buffers,streams, <br /> away from wetlands,streams,and buffers. wetland or River <br /> Plants and Animals J: Disturbance will be limited to the smallest area feasible for Construction BA/HMP p 15, Responsible During <br /> each phase of the project FEIS 4.5.4.4 party doing the construction <br /> work/project activities <br /> Plants and Animals K: Construction waste materials will be collected and sorted Construction BA/HMP p 15 Responsible During <br /> with respect to recycling categories and disposed of off-site and in accordance with party doing the construction <br /> applicable regulations. work/project activities <br /> Plants and Animals L: Entrance rumble areas will be installed to remove soil from Construction ' BA/HMP p 15 Responsible During <br /> truck traffic party doing the construction <br /> I-7 <br />