My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3674-19
>
Ordinances
>
Ordinance 3674-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2019 10:57:10 AM
Creation date
5/21/2019 10:56:29 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3674-19
Date
5/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 TO ORDINANCE <br /> ATTACHMENT I <br /> SECOND AMENDMENT TO DEVELOPMENT AGREEMENT <br /> EVERETT RIVERFRONT REDEVELOPMENT (LANDFILL) <br /> FEIS MITIGATION REQUIRED <br /> Element of the Environment Action Mitigation is Where found in Resp.Party Implementation <br /> And tied to EIS Documents Time Frame <br /> Mitigation Measure <br /> Public Services and Utilities E:Provide a looped water distribution system and All Development DEIS 5.6.5.1 RC Land Division, <br /> fire hydrants throughout the project site to provide adequate fire flow,and provide Building Permits <br /> adequate fire flow for each development phase as the project is built out. <br /> Public Services and Utilities F:Provide a storm water conveyance system with All Development DEIS 5.6.5.1 RC PDO, <br /> adequate capacity throughout the project site,and as part of each phase of site Subdivisions <br /> redevelopment and/or Binding <br /> Site Plan <br /> approvals <br /> Public Services and Utilities G: Coordinate with the PUD to provide needed All Development DEIS 5.6.5.1 RC Prior to <br /> electrical system upgrades and new facilities adequate to serve each phase of the construction of <br /> project,and to maintain existing electrical service to the area. buildings <br /> Public Services and Utilities H:Coordinate with all utility service providers All Development DEIS 5.6.5.1 RC Prior to <br /> regarding the location of proposed structures,utilities and site grading during the construction of <br /> construction of each phase of redevelopment. buildings <br /> Public Services and Utilities I: Comply with requirements of the Consent Decree Development on DEIS 5.6.5.1 RC Prior to <br /> for all activities on the Landfill/Tire Fire site,including methods for installation of Landfill construction <br /> all utilities and services. <br /> Public Services and Utilities I: Use best management practices to mitigate water All Development DEIS 5.6.5.1 RC Prior to and <br /> quality impacts during construction. during <br /> construction <br /> Public Services and Utilities J: Comply with the City's Land Use Code and All Development DEIS 5.6.6 RC Shoreline Permits, <br /> related development regulations Building Permits, <br /> Land Division. <br /> Prior to <br /> construction <br /> Public Services and Utilities K: Provide a Master Plan,PDO Zone and All Development DEIS 5.6.6 RC Prior to <br /> Development Agreement consistent with the policies of the Comprehensive Plan construction <br /> and provisions of the Land Use Code. <br /> Public Services and Utilities L: Meet or exceed open space and recreation All Development, DEIS 5.6.6 RC Building Permits <br /> requirements of the Multiple Family Zone and design guideline section of the and PDO <br /> City's Land Use code,and meet or exceed the open space requirements of the adoption <br /> I-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.