Laserfiche WebLink
EXHIBIT 1 TO ORDINANCE <br /> ATTACHMENT I <br /> SECOND AMENDMENT TO DEVELOPMENT AGREEMENT <br /> EVERETT RIVERFRONT REDEVELOPMENT (LANDFILL) <br /> FEIS MITIGATION REQUIRED <br /> Element of the Environment Action Mitigation is Where found in Resp.Party Implementation <br /> And tied to EIS Documents Time Frame <br /> Mitigation Measure <br /> City's Land Division Ordinance for any proposed land division. Design concepts <br /> will be included in the proposed PDO. <br /> Public Services and Utilities M:Coordinate school mitigation fees with the Everett Residential DEIS 5.6.6. RC PDO Building <br /> School District: Development Permits <br /> Public Services and Utilities N:Meet or exceed the City's multi-family residence Multi-Family DEIS 5.6.6. RC Building Permits <br /> design guideline and standards. The project will meet the neighborhood design Residential and PDO <br /> standards' emphasis on crime prevention through design. Development adoptions <br /> Public Services and Utilities 0: To the extent required in the PDA or in the All Development DEIS 5.6.6 RC Building Permits <br /> Development Agreement,as amended,use sustainable building and development and PDO <br /> practices Such as the LEED system intended to provide high-quality design for a adoption <br /> livable environment, including but not limited to: a)Compact development <br /> promoting livability and pedestrian traffic;b)Design of buildings to shape walk <br /> able streets;c)Pedestrian-oriented streets;and d)Open Community,ensuring that <br /> streets, sidewalks and public spaces are available for public use and not enclosed <br /> within a gated enclave. <br /> Public Services and Utilities P: Comply with City of Everett Building and Fire All Development DEIS 5.6.6 RC Building Permits <br /> Codes <br /> Public Services and Utilities Q: Comply with City of Everett Utility system All Development DEIS 5.6.6 RC Prior to <br /> standards and applicable connection fees. construction <br /> Public Services and Utilities R: Obtain Ecology Section 401 Water Quality All Development DEIS 5.6.6 RC Prior to <br /> Certification and general or individual National Pollutant Discharge Elimination construction <br /> System(NPDES)storm water construction permit(s). <br /> Public Services and Utilities S: During construction,implement security measures All Development DEIS 5.6.7 RC During <br /> such as site lighting,fencing,on-site surveillance, etc.to reduce potential criminal construction <br /> activity. <br /> • Environmental Health and Hazardous Waste A: Follow Provisions of Development on DEIS 5.7.2.1, Responsible Reviewed by and <br /> Consent Decree and Cleanup Action Plan(CAP)with approval by the Landfill Development 5.7.3.1 party doing the approved by the <br /> Department of Ecology and the City of Everett on Landfill work/project Washington State <br /> Department of <br /> I-17 <br />