Laserfiche WebLink
:'5;''' <br /> ' PL/BL/C WORKS <br /> P�.y y��. <br /> May 29, 2003 <br /> Foster Layden <br /> 801 Laurel Drive <br /> Everett, WA 98201 <br /> Project: Rizzos Coffee House <br /> Job Address: 2908 Wetmore Avenue <br /> Plan Review No: B0305-039 <br /> Dear Mr. Layden: <br /> In response to your application for a construction permit, your plans have been examined <br /> and you are advised that the issuance of a permit is being withheld for the reasons listed <br /> below. These comments address building issues only. Additional revisions or additions <br /> may be required by other departments (such as Utilities, Planning or Fire). All references <br /> refer to the 1997 Uniform Building code, as amended by the State of Washington. <br /> This review does not cover any submitted mechanical, sprinkler, electrical or plumbing <br /> documents — these permits must be obtained separately and may require further review <br /> and submission of plans. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two complete new sets of drawings reflecting the <br /> corrections requested. <br /> 1) The submission is not sufficient and a complete review is not possible until the <br /> following items are provided: <br /> i) The occupancy, occupant load, type of construction and project area must be <br /> indicated. <br /> ii) The new walls/partitions must be shown on the plans to include their height <br /> and construction. <br /> iii) The mezzanine must be included in the plans to include its proposed use. <br /> iv) The plans must be scaleable (the submitted plan has been reduced). <br /> CITY OF EVERETT• 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8856 <br />