Laserfiche WebLink
6. Specify on the floor plans the location of the new posts. Sheet 4 shows the footings <br /> inset from the walls. <br /> 7. Specify the connection at post/footing and post/beam capable of resisting uplift and <br /> lateral loads. <br /> 8. Specify the size and thickness of the footing supporting the new posts. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> Please prepare a response letter showing where each item in this <br /> correction letter is addressed on the plan set. <br /> Sincerely, <br /> Jeff Heilman <br /> Development Technician <br /> 425-257-8976 <br /> Email: iheilman©aci.everett.wa.us <br /> S:\1Common\Clerical\7Heilman\CW1607-001(4810 S 3RD AVE).doc <br />