My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5200 EVERGREEN WAY 2019-05-29
>
Address Records
>
EVERGREEN WAY
>
5200
>
5200 EVERGREEN WAY 2019-05-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:54:50 AM
Creation date
5/29/2019 10:32:21 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
5200
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subsurface Exploration,Geologic Hazards,and <br /> Former Brien Ford Preliminary Geotechnical Engineering Report <br /> Everett, Washington Preliminary Design Recommendations <br /> should be followed at all times. Permanent cut and structural fill slopes that are not intended <br /> to be exposed to surface water should be designed at inclinations of 2H:1V or flatter. All <br /> permanent cut or fill slopes should be compacted to at least 95 percent of the modified Proctor <br /> maximum dry density, as determined by ASTM D-1557, and the slopes should be protected <br /> from erosion by sheet plastic until vegetation cover can be established during favorable <br /> weather. <br /> 10.0 STRUCTURAL FILL <br /> All references to structural fill in this report refer to subgrade preparation, fill type and <br /> placement, and compaction of materials, as discussed in this section. If a percentage of <br /> compaction is specified under another section of this report, the value given in that section <br /> should be used. <br /> Before placement of structural fill the exposed subgrade should be observed and approved to <br /> the satisfaction of the geotechnical engineer; the upper 12 inches of exposed ground in areas to <br /> receive fill should be recompacted to 90 percent of the modified Proctor maximum density <br /> using ASTM D-1557 as the standard. If the subgrade contains silty soils and too much moisture, <br /> adequate recompaction may be difficult or impossible to obtain, and should probably not be <br /> attempted. In lieu of recompaction, the area to receive fill should be blanketed with quarry <br /> spalls to act as a capillary break between the new fill and the wet subgrade. Where the <br /> exposed ground remains soft and further overexcavation is impractical, placement of an <br /> engineering stabilization fabric may be necessary to prevent contamination of the free-draining <br /> layer by silt migration from below. <br /> After recompaction of the exposed ground is tested and approved, or a free-draining quarry <br /> spall course is laid, structural fill may be placed to attain desired grades. Structural fill is <br /> defined as non-organic soil, acceptable to the geotechnical engineer, placed in maximum 8-inch <br /> loose lifts, with each lift being compacted to 90 to 95 percent of the modified Proctor maximum <br /> density, depending on project specifications, using ASTM D-1557 as the standard. Placement of <br /> structural fill should also be in accordance with the project plans and specifications and current <br /> City of Everett codes and standards where applicable. The top of the compacted fill should <br /> extend horizontally outward a minimum distance of 3 feet beyond the locations of the roadway <br /> edges before sloping down at an angle of 2H:1V. <br /> The contractor should note that any proposed fill soils must be evaluated by AESI prior to their <br /> use in fills. This would require that we have a sample of the material 72 hours in advance to <br /> perform a Proctor test and determine its field compaction standard. Soils in which the amount <br /> of fine-grained material (smaller than the No. 200 sieve) is greater than approximately <br /> 5 percent (measured on the minus No. 4 sieve size) should be considered moisture-sensitive. <br /> Use of moisture-sensitive soil in structural fills should be limited to favorable dry weather <br /> May 16,2017 ASSOCIATED EARTH SCIENCES,INC. <br /> AWR/Id-160594V003-2-Projects�201605941KVIWP Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.