My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5200 EVERGREEN WAY 2019-05-29
>
Address Records
>
EVERGREEN WAY
>
5200
>
5200 EVERGREEN WAY 2019-05-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:54:50 AM
Creation date
5/29/2019 10:32:21 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
5200
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINAL MITIGATED <br /> DETERMINATION OF NON-SIGNIFICANCE <br /> SEPA 17-010 <br /> July 11,2017 <br /> Description of Proposal: The proposed action is to excavate approximately 2,475 cubic yards of soil for <br /> remediation of petroleum-contaminated material (soil). The proposal includes partial demolition of an <br /> existing commercial sales building for access to the excavation site. Upon completion of the remediation <br /> project,the areas of excavation will be backfilled and then paved for additional facility operations of the auto <br /> dealership on site. <br /> Applicant: Casey Salz <br /> 5200 Evergreen Way <br /> Everett,WA 98203 <br /> Location: 5200 Evergreen Way Everett, WA 98203 <br /> Zoning: E-1,Evergreen Way Zone <br /> General Plan: 4.4,Mixed Use Commercial <br /> Lead Agency: City of Everett Planning Department <br /> Contact Person: Kelsey Heyd 425.257.7275 <br /> Mitigation Measures: <br /> The environmental impacts of this proposal are documented in the Environmental Checklist and other <br /> information on file with the City. The listed requirements are placed in response to our review of this <br /> information: <br /> OTHER AGENCIES WITH JURISDICTION:None identified <br /> MITIGATION OF ADVERSE IMPACTS BY SEPA <br /> 1. Any grading/fill on this site shall be done so as to not impact the surrounding properties. (SEPA <br /> Earth,Land and Shoreline Use Policies.) <br /> 2. If anything of possible archaeological interest is uncovered during excavations or development, the <br /> Applicant must immediately stop work and notify the City and the affected Tribes, and consult with a <br /> professional archaeologist who must inspect and evaluate the site. In the event that ground disturbing <br /> or other constructing activities result in the inadvertent discovery of the archaeological resources, <br /> work shall be halted in the immediate area, and contact made with the City of Everett, the <br /> Department of Archaeology and Historic Preservation (DAHP), and cultural resources office of the <br /> affected Tribes. Work must be halted until such time as further investigation and appropriate <br /> consultation is concluded. In the event of the inadvertent discovery of human remains, work shall be <br /> immediately halted in the discovery area, the remains covered and secured against further <br /> disturbance, and communication established with project administrative personnel, local law <br /> enforcement,DAHP and authorized Tribal representatives. <br /> :e1of4 <br /> SEPA17-010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.