My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5200 EVERGREEN WAY 2019-05-29
>
Address Records
>
EVERGREEN WAY
>
5200
>
5200 EVERGREEN WAY 2019-05-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:54:50 AM
Creation date
5/29/2019 10:32:21 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
5200
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The lead agency for this proposal has determined that it does not have a probable significant adverse impact <br /> on the environment. An Environmental Impact Statement is not required under RCW 43.21C.030(2)(c). This <br /> determination assumes compliance with State law and City ordinances related to general environmental <br /> protection including but not limited to right-of-way improvement requirements, drainage, etc. This decision <br /> was made after review of a completed environmental checklist and other information on file with the lead <br /> agency. This information is available to the public on request. This Mitigated Determination of Non- <br /> Significance is specifically conditioned on compliance with the conditions attached hereto which are <br /> incorporated by reference as if fully set forth herein. <br /> This MDNS is issued under WAC 197-11-355. A 14-day public comment period for this proposal has been <br /> completed. <br /> Responsible <br /> Official: Allan Giffen 425.257.8731 <br /> Title: Planning and Community Development Director <br /> Address: 2930 Wetmore Avenue, Suite 8-A,Everett, WA 98201 <br /> Date: July 11 2017 <br /> Signature: ( rz A L-t.- Gt \J <br /> You may appeal this determination by filing an appeal on forms provided by the Planning Department and a <br /> fee to the Planning and Community Development Permit Services Counter at 3200 Cedar Street, 2nd Floor, <br /> no later than 14 days from the date the MDNS becomes final. <br /> Contact Kelsey Heyd to read or ask about the procedures for SEPA appeals. <br /> Note: <br /> 1.) A MDNS may be withdrawn in the event of significant changes in the proposal, disclosure of new <br /> significant information, misrepresentation by the applicant, or failure to comply with the conditions <br /> upon which this Mitigated Determination of Non-Significance is predicated. <br /> 2.) The land use permit shall terminate if applicant does not apply for a building permit within 18 months <br /> (or, with an extension, 24 months), except where a time limit on the land use permit is otherwise <br /> established under federal or state law,city ordinance, or an executed development agreement. <br /> 3.) The issuance of the Mitigated Determination of Non-Significance does not constitute project <br /> approval. The applicant must demonstrate and comply with all applicable requirements of Everett's <br /> Municipal Code(EMC)prior to receiving any permits. <br /> INFORMATION FOR DEVELOPER: <br /> The following information is provided for the developer's benefit. These are not SEPA conditions but are <br /> associated with other laws or requirements. All requirements are preliminary in nature, and are based upon <br /> the preliminary site plan and the ordinances in effect at time of submittal for SEPA review. The proposal <br /> must comply with all ordinances in effect at the time a complete building permit application is filed, <br /> including those not specifically set forth herein. Contact the Planning Department for information regarding <br /> appeals processes for the requirements listed in this document. <br /> Page 2 of <br /> SEPA17-010 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.