My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6502 EVERGREEN WAY ENHANCED SERVICE FACILITIES 2020-01-21
>
Address Records
>
EVERGREEN WAY
>
6502
>
ENHANCED SERVICE FACILITIES
>
6502 EVERGREEN WAY ENHANCED SERVICE FACILITIES 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 9:13:55 AM
Creation date
5/29/2019 3:24:21 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6502
Tenant Name
ENHANCED SERVICE FACILITIES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSULTING ENGENEERS <br /> RESPONSE: We have updated"Reinforcement" section of General Notes sheet to incorporate this <br /> requirement. <br /> Comment#6: On Detail 4/S302, it appears that there are several blank spaces reserved,please clarify <br /> or update detail for clarity. <br /> RESPONSE: The referenced detail has been updated. <br /> 111 <br /> Comment#7: The typical yielding mechanism for concrete shear walls is at the base of the shear walls. <br /> Per ACI 318-14 Sec 18.13.2.1,foundation reinforcement is to be fully developed for tension of the bars. <br /> By extension, where yielding is expected to occur for the reinforcement, the full expected tension <br /> (1.25fy). Please provide lap splices for concrete shear walls which have 125%lap splice length. Please <br /> provide a schedule or update details as required. <br /> RESPONSE: We have updated the splice schedule provided on 5/S302 to this effect (refer to note#6 in <br /> this detail). <br /> Comment#8:Per ASCE 7-10 Sec 12.3.4.2,please provide provisions to check for p,for both the wood <br /> framed and concrete structures. <br /> RESPONSE: We are considering rho as 1.3 for both wood and concrete structure. Note that for wood <br /> building was already designed considering Rho as 1.3. Please see updated calculations for the same. <br /> Comment#9: Please provide a diaphragm design for the post-tensioned concrete slab. Include checks <br /> for shear, chord reinforcement, drag struts, and dowel designs as required to transfer loading. <br /> RESPONSE: Please see pages#187 to 199 in calculation package submitted. <br /> Comment#10: It appears that your calculations state that the basement wall design (W3) is assuming <br /> the walls are spanning horizontally between W1 & W4 instead of traditionally spanning vertically 10'- <br /> 0"from slab-on-grade to the post-tensioned concrete slab. However, the permit calculations don't <br /> appear to indicate this. If they are spanning vertically,please clarify and update reinforcement and <br /> design as required, accounting for unbalanced soil loads into the global analysis of the structure. If they <br /> are spanning horizontally,please clarify. <br /> RESPONSE: Wall has been designed vertically for out of plane loads. The above comment is due to <br /> wording error on our previously submitted calculation package. Please see updated calculation package <br /> for this revision(see page#75). <br /> Comment#11: For concrete shear walls,please indicate which phi factor(0) was used for the design of <br /> shear walls per ACI 318-14 Sec 21.2.4 for shear. <br /> RESPONSE: Shearwalls have now been redesigned and rechecked using Etabs. Please see Etabs report <br /> section(on page#138) for this requirement which has been considered in the design of shearwalls. <br /> 2200 6TH AVENUE, #601 WW'W.PSM-LNGJ.NEERS.COM PHONE 206-622-4580 <br /> SEATTLE WASHINGTON 98121 USA FAX 206-622-0422 <br />
The URL can be used to link to this page
Your browser does not support the video tag.