My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2900 GRAND AVE PAGODA VILLAGE 2025-07-28
>
Address Records
>
GRAND AVE
>
2900
>
PAGODA VILLAGE
>
2900 GRAND AVE PAGODA VILLAGE 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 8:56:50 AM
Creation date
5/30/2019 7:21:35 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2900
Tenant Name
PAGODA VILLAGE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
515
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 9: HISTORICAL AND CULTURAL RESOURCES <br /> The site has not been listed on any historical or cultural resource registers or lists. <br /> Mitigation Measures <br /> No additional mitigation is required. <br /> Section 10: FISH AND WILDLIFE <br /> 10.1 Mitigation Required by Existing Regulations <br /> Measures to mitigate impacts to fish and wildlife habitat are not necessary for the continued redevelopment of <br /> Downtown. However, City standards and services such as erosion control and treatment of storm water will <br /> protect Puget Sound and the Snohomish River,which do provide habitat for fish species. <br /> Mitigation Measures <br /> No additional mitigation is required. <br /> Section 11: GEOLOGY <br /> The project will be required to comply with International Building Codes and City of Everett Public Works <br /> Standards. <br /> Mitigation Measures <br /> No additional mitigation is required. <br /> Section 12: ENVIRONMENTAL HEALTH <br /> There are a number of state, federal, and local requirements that are identified in the Planned Action <br /> ordinance to ensure potential environmental health risks are adequately mitigated. <br /> Mitigation Measures <br /> No additional mitigation is required. <br /> Section 13: WATER QUALITY <br /> Storm water from this property is treated at the City's waste water treatment plant. <br /> Mitigation Measures <br /> No additional mitigation is required. <br /> Section 14: AESTHETICS <br /> The project design will comply with the general aesthetic standards for the B-3 zone. <br /> Mitigation Measures <br /> _� e <br /> 4// 7) <br />
The URL can be used to link to this page
Your browser does not support the video tag.