My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2900 GRAND AVE PAGODA VILLAGE 2025-07-28
>
Address Records
>
GRAND AVE
>
2900
>
PAGODA VILLAGE
>
2900 GRAND AVE PAGODA VILLAGE 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 8:56:50 AM
Creation date
5/30/2019 7:21:35 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2900
Tenant Name
PAGODA VILLAGE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
515
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> 4� ( �� DARGEY <br /> \ • DEVELOPMENT <br /> April 30, 2015 <br /> Mr. Steve Ingalsbe, Planner <br /> Planning& Community Development <br /> 2930 Wetmore Avenue,Suite 8A <br /> Everett,WA 98201 <br /> SUBJECT: Permit B1306-035 <br /> Inspection Report Issued 4-23-15 <br /> Dear Steve, <br /> The Potala Place Everett construction project received an inspection report on April 23,2015. The report noted that the <br /> balcony decks being installed are not constructed per the approved design and plans. The following narrative describes <br /> this and several other changes that were necessary during the course of construction. Sheets 60.03,G0.04 and G0.05 in <br /> the permit set, list the project's zoning code analysis and requirements. More specifically,the code analysis and changes <br /> called into question on the inspection report,can be found on sheet G0.04. The changes made to the items listed on this <br /> sheet,are listed in a matrix format in Attachment A. In an effort to keep things brief and on point,only the subject items <br /> shown on sheet 60.04 which have changes are listed in the matrix. Within these subject matters, there will be sub- <br /> categories that may be listed as unchanged but have been included so that the entire subject matter is covered in the <br /> document. A copy of sheet G0.04 has been included along with other graphics in Attachment B. <br /> We believe the changes outlined in the attached sheets are relatively minor in nature and on the whole a net positive for <br /> the project. Building facade articulation was increased by using three dimensional parapets and color changes rather than <br /> the raised integral sunshades of the balconies. We expect the new colored glass highlights on the balconies to provide an <br /> elegant, yet not overstated aesthetic. These highlights are expected to add visual interest in a manner similar to the <br /> screened balconies in the permitted drawings. The city sidewalks will be constructed to city standards similar to those in <br /> front of the newly constructed Hampton Inn and other recently improved city sidewalks. Added metal tree grates will <br /> provide a more polished streetscape. <br /> Should you have any questions regarding this information, please feel free to call me at 425-876-7305. <br /> Sincerely, <br /> ill."-- <br /> Joe Zlab, PE, <br /> Vice President of Construction <br /> Cc: Paul McKee,City of Everett <br /> Lobsang Dargey, Path America F`1 ' <br /> Enclosures <br /> Bellevue Office: Everett Office: Billing Office: <br /> 500 108th Avenue NE,Suite 2020 2804 Grand Ave,Suite 308 PO Box 13261 <br /> Bellevue,WA 98004 Everett,WA 98201 Everett,WA 98201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.