Laserfiche WebLink
Kirk Brooks <br /> From: Kirk Brooks <br /> Sent: Wednesday,July 26, 2017 9:48 AM <br /> To: 'Joseph Smeby' <br /> Cc: Jim Ventura; Erik Emerson <br /> Subject: 2220 Gibson PI/ New SFR <br /> Attachments: 20170726093952396.pdf <br /> Joe, <br /> We have completed the civil review for this project.There are some plan review/drainage issues for consideration. <br /> They are; <br /> • Our charts indicate a side sewer already installed for the lot. It shows up as a 6" PVC(see attached).This may be <br /> a preferred connection point for the sewer. <br /> • A sprinkler system will be required for the house. I have reviewed the project with the Fire Department.They <br /> will require a 13D system which can run off the domestic water service which will likely need to be at least a 1" <br /> service. <br /> • I have attached a memo from our storm water department regarding their review.There is a variation of the <br /> DOE manual criteria that is particular to the City of Everett which will likely require plan revisions.You will need <br /> to contact Erik with questions. <br /> Regards, <br /> Kirk Brooks <br /> City of Everett Public Works Department I Development Technician <br /> 3200 Cedar St, Everett, WA 98201 <br /> Office: 425-257-8810 <br /> Direct: 425-257-8814 <br /> Email: kbrooks(a.everettwa.gov <br /> All emails, and attachments, sent to and from City of Everett are public <br /> records and may be subject to public disclosure pursuant to RCW 42.56. <br /> 1 <br />