Laserfiche WebLink
UBLIC ORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />fateApplied: 5/12/2016 <br />Public ks Permit #: PW1605-013 <br />Building Permit #: <br />Planning Reference #: <br />Public Works Fee: <br />B1605-015, B1605-017 <br />SEPA16-006 <br />$4880 <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />SEAWAY WEST LLC <br />BARGHAUSEN CONSULTING ENGINEER <br />8201 164TH AVE NE STE 200 <br />18215 72ND AVE S <br />REDMOND, WA, 98052 <br />KENT, WA, 98032 <br />PHONE: 4252854322 <br />PHONE: 4252516222 <br />TAX PARCEL ID #: 28040300400300 <br />SITE ADDRESS: 3301 SEAWAY BLVD <br />DESCRIPTION: SITE DEVELOPMENT FOR BERTCH WAREHOUSES <br />Construction of two office/warehouse buildings along with the associated grading, paved parking, landscaping, water and <br />sanitary sewer connections, and storm drainage system. <br />SEC 03 TWP 28 RGE 04 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards and <br />Specifications for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans, SWPPP, and drainage report approved by the City of Everett Public Works Department <br />dated 5/5/2017. Approved plans must remain on job -site all all times. <br />5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 with all inspection requests throughout the <br />constuction duration. This permit must be finaled at the end of the project. <br />6. Install erosion control measures must be set up prior to starting construction and maintained adequately through t -i jiq <br />construction.-• �- Ma .^„ <br />7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />8. Protect all critical areas and infrastructure during construction including but not limited to NGPErealop�s, existing <br />underground utilities, etc. Access and clearing limits for pond construction (1 st phase of constructiog) mNt-obtrictl�;followed. <br />9. Special Inspections are required to be preformed and approved prior to final inspection and approval of this Publi,:7- orks <br />-. i 17 <br />Permit. t ,.P„ , 'rTun <br />10. Daily geotechnical reports shall be submitted to the Public Works Inspector (RAIlen@everettwa.gE ).�'- <br />1 <br />Public Works Permit Fee Breakdown: (Paid on 4/27/2017) <br />Paving(208,256SF)........................................$1,041.28. <br />Grading/Fill/Excavate(5,057CY) .......................$305.00� g r, .,-•y <br />�.. .00 <br />PW Plan Review...........................................$23,481.36 <br />PW Site Inspection........................................$46,962.72 B Ell �E:1 <br />rs <br />Remaining Balance: <br />Third -Party Geotechnical Review fees: <br />Invoice 27069..................................$3,180.00 T �'� <br />Invoice 27124.....................................$340.00 <br />Invoice 27331..................................$1,360.00 <br />City of Everett Ofclal Use Only ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save <br />harmless the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation and <br />maintenance of the improvement or other right-of-way use here to applied <br />Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br />re e public property damaged thereby. <br />f <br />FINAL INSPECTION Date <br />Approved as Constructed (PW Inspector) Signature o Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br />COMPLETEION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />R I., t~ _ 4 <br />