My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3301 SEAWAY BLVD WHOLE SITE 2025-10-30
>
Address Records
>
SEAWAY BLVD
>
3301
>
WHOLE SITE
>
3301 SEAWAY BLVD WHOLE SITE 2025-10-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2025 8:09:23 AM
Creation date
6/4/2019 9:20:56 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
3301
Tenant Name
WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UBLIC -ORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />=ate Applied: <br />Public Works Permit #: <br />Parent Permit #: <br />8 AVG 2017 <br />5/12/2016 <br />PW1605-013 *Revision <br />Planning Reference #: SEPA16-006 <br />Public Works Fee: $700.00 <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />SEAWAY WEST LLC <br />BARGHAUSEN CONSULTING ENGINEER <br />8201 164TH AVE NE STE 200 <br />18215 72ND AVE S <br />REDMOND, WA, 98052 <br />KENT, WA, 98032 <br />PHONE: 4252854322 <br />PHONE: 4252516222 <br />TAX PARCEL ID #: 28040300400300 <br />SITE ADDRESS: 3301 SEAWAY BLVD <br />DESCRIPTION: SITE DEVELOPMENT FOR BERTCH WAREHOUSES <br />Revision to Pond liner and construction detail. Approved per third -party Geotechnical Review by HWA. <br />KEEP THIS REVISED PERMIT AND THE ORIGINAL PERMIT ON -SITE AT ALL TIMES, AS CONDITIONS OF <br />BOTH PERMITS ARE VALID AND MUST BE FOLLOWED. CONDITIONS NOT DUPLICATED ON THIS PERMIT. <br />SEC 03 TWP 28 RGE 04 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett `Design and Construction Standards <br />and Specifications for Development'. <br />3. Call Location Underground Service 48 hours before dig. The day does <br />you you call not count. TOLL FREENUNIO& 811. <br />4. Detention Pond Work to be done per Revised Plans and Details approved on 8/28/2017, and SWPW and ain&be <br />report approved by the City of Everett Public Works Department dated 5/5/2017. Approved plans ni E1 ainAn job -site all <br />all times. Revisions to approved plans must replace old plans and remain on -site. rTl ,' w. <br />5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 with all inspection requestthroughout <br />the constuction duration. This permit must be finaled at the end of the project.; <br />6. Install erosion control measures must be set up prior to starting construction and maintained adequately throughtybj.;, <br />construction. rw, <br />8. Protect all critical areas and infrastructure during construction including but not limited to NGPE Arq, steep slopes��� <br />existing underground utilities, etc. Access and clearing limits for pond construction (1st phase of connt ction) must bQ <br />strictly followed. F <br />9. Special Inspections are required to be preformed and approved prior to final inspection and appr p - his Public Works <br />Permit. Inspections by Northwest Linings shall be performed and reported to the Public Works Insp t&. ,1 Via' <br />10. Daily geotechnical reports shall be submitted to the Public Works Inspector (RAI len @everettwa. gov). 5' "� � <br />1_.,, <br />r <br />Remaining Balance` °tea POSTING`� <br />"� <br />Third -Party Geotechnical Review fees: <br />Revision to Pond Liner Detail.................$700.00 <br />City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save <br />harmless the City of Everett from any and all claims for damages, costs, <br />8 Zg expenses, or causes of action that may arise because of installation and <br />maintenance of the improvement or other right-of-way use here to applied <br />Appmved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br />replace public prope damaged thereby. <br />l 111 <br />FINAL INSPb7ffON Date <br />Approved as Constructed (PW Inspector) Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br />COMPLETEION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON.THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.