Laserfiche WebLink
• <br /> 8. PRIOR TO USE,THE GEOTECHNICAL ENGINEER SHALL EXAMINE AND TEST ALL <br /> E �- /, N (co y;-�� pp ED) MATERIALS IMPORTED TO THE SITE FOR USE AS STRUCTURAL FILL. <br /> pC�` II\\\ IIII \\V9 YCHu lFGEOTECHNICAL NOTES 9. STRUCTURAL FILL SHALL BE PLACED IN UNIFORM LOOSE LAYERS NOT EXCEEDING 12 <br /> pry SECTIONS GEOTECHNICAL H NOTES INCHES AND COMPACTED TO A MINIMUM OF 95 PERCENT OF THE SOIL'S MAXIMUM <br /> 1O0�'1 F✓��IO�� 1. PRIOR TO CONSTRUCTION ALL VEGETATION,ORGANIC SURFACE SOILS,AND DRY NG AND MATERIALS <br /> (ASEANNSTIY,AS TEST DESIGNATIONIND-698 E BY(STANDAROERICAN SPROCTOR).00IETY R THE TIMOISTURE CONTENT <br /> DELETERIOUS MATERIALS SHALL BE STRIPPED AND REMOVED FROM THE SITE. BASE OF THE SOIL AT THE TIME OF COMPACTION SHOULD BE WITHIN TWO PERCENT OF <br /> ON CONDITIONS OBSERVED IN THE TEST PITS,THE DEPTH OF THE STRIPPING CAN ITS OPTIMUM,AS DETERMINED BY THIS ASTAI STANDARD. <br /> DER BE EXPECTED TO BE BETWEEN 6 AND 18 INCHES. THESE STRIPPINGS WILL NOT BE <br /> SUITABLE FOR USE AS STRUCTURAL FILL.BUT MAY BE USED FOR LIMITED DEPTHS IX. IN NONSTRUCTURAL AREAS.THE DEGREE OF COMPACTION CAN BE REDUCED TO 90 <br /> IN NONSTRUCTURAL AREAS OR FOR LANDSCAPE PURPOSES, PERCENT. <br /> )6 SEC. 3, I WP. 28 N., NGE 4 EAST, W.M. 2. PRIOR TO PLACING FILL,ALL EXPOSED BEARING SURFACES SHOULD BE OBSERVED 11. ALL STRUCTURAL FILL IN CITY OF EVERETT RIGHTS OF WAY MUST CONFORM TO CITY <br /> YE OF WASHINGTON BY THE GEOTECHNICAL ENGINEER TO VERIFY SOIL CONDITIONS ARE AS EXPECTED MATERIALS AND COMPACTION SPECIFICATIONS. <br /> AND SUITABLE FOR SUPPORT OF NEW FILL <br /> 12. ALL EXCAVATIONS AT THE SITE ASSOCIATED PATH CONFINED SPACES,SUCH AS <br /> 3, A PROOFROLL USING HEAVY RUBBER-TIRED EQUIPMENT MAY 8E REQUIRED TO UTILITY TRENCHES,MUST BE COMPLETED IN ACCORDANCE WITH LOCAL.STATE,AND <br /> DETERMINE IF ANY ISOLATED SOFT AND YIELDING AREAS ARE PRESENT. FEDERAL REQUIREMENTS. BASED ON CURRENT WASHINGTON INDUSTRIAL SAFETY AND <br /> 'HEALTH ACT(WISHA)REGULATIONS,LOOSE TO MEDIUM DENSE WEATHERED SOILS <br /> 4. IF EXCESSIVELY YIELDING AREAS ARE OBSERVED,AND THEY CANNOT BE STABILIZED AND MEDIUM DENSE TO DENSE OUTWASH SOILS WOULD BE CLASSIFIED AS TYPE C <br /> IN PLACE BY COMPACTION,THE AFFECTED SOILS SHALL BE EXCAVATED AND SOILS. THE DENSE TO VERY DENSE UNWEATHERED TILL SOILS WOULD BE <br /> REMOVED TO FIRM BEARING AND GRADE RESTORED WITH NEW STRUCTURAL FILL. CLASSIFIED AS TYPE A SOILS. <br /> BENEATH EMBANKMENT FILLS OR ROADWAY SUBGRADE IF DEPTHS OF EXCAVATIOII TO <br /> PLACE ROCK I.ABOVE CROWN REMOVE UNSTABLE SOILS IS EXCESSIVE,THE USE OF GEOTEXIIIE FABRICS,SUCH 13. TEMPORARY EXCAVATIONS IN TYPE C SOILS SHOULD HAVE THEIR SLOPES LAID BACK <br /> AS LIIRAFI 500X,OR EQUIVALENT FABRIC,CAN BE USED IN CONJUNCTION WITH AT AN INCLINATION OF 1.5:1 (HORIZONTZL:VERTICAL)OR FLATTER,FROM THE TOE TO <br /> CLEAN GRANULAR STRUCTURAL FILL. THE CREST OF THE SLOPE. SIDE SLOPES IN TYPE A SOILS CAN BE IAD BACK AT <br /> A SLOPE INCLINATION OF 0.75 OR FLATTER. FOR TEMPORARY EXCAVATION SLOPES <br /> .-2'AIINj —m. 5. THE NATIVE TILL AND SILTIER OUTWASN SOILS ENCWNTERED AT THE SITE CONTAIN LESS THAN 8 FEET IN HEIGHT IN TYPE A SOILS,THE LOWER 3.5 FEET CAN BE CUT <br /> 1 - IOW A SUFFICIENT AMOUNT OF SOIL FINES THAT WILL!LAKE THEM DIFFICULT TO COMPACT <br /> AS STRUCTURAL FILL WHEN TOO WET OR TOO DRY. THE ABILITY TO USE THESE TO A VERTICAL CONDITION,WITH A 0.7&I SLOPE GRADED ABOVE. FOR TEMPORARY <br /> 1 ^ <br /> THIN. DISCHARGE NAME SOILS FROM SITE EXCAVATIONS AS STRUCTURAL FILL WILL DEPEND ON ITS EXCAVATION SLOPES GREATER THAN 8 FEET IN HEIGHT UP TO A MAXIMUM HEIGHT <br /> OF 12 FEET,THE SLOPE ABOVE THE 3.5-FOOT VERTICAL PORTION WILL NEED TO <br /> TIVPIPE MOISTURE CONTENT AND THE PREVAILING WEATHER CONDITIONS AT THE TIME OF BE LAUD BACK AT A MINIMUM SLOPE INCLINATION OF I:1. NO VERTICAL CUT WITH <br /> CONSTRUCTION. IF WET SOILS ARE ENCOUNTERED,THE CONTRACTOR WILL NEED TO A BACKSLOPE IMMEDIATELY ABOVE IS ALLOWED FOR EXCAVATION DEPTHS THAT <br /> DRY THE SOILS BY AERATION DURING DRY WEATHER CONDITIONS OR USE AN EXCEED 12 FEET. IN THIS CASE,A FOUR -FOOT VERTICAL CUT WITH AN <br /> ADDITIVE SUCH AS CEMENT OR LIME TO STABILIZE THE SOIL EQUIVALENT HORIZONTAL BENCH TO THE CUT SLOPE TOE IS REQUIRED. ALL <br /> ROCK THICKNESS-I'MIN.(AS SHOWN ON PLAN) 6. THE CLEANER OUTWASH SOILS ON-SITE SHOULD BE SUITABLE FOR USE AS EXPOSED TEMPORARY SLOPE FACES THAT WILL REALN OPEN FOR AN EXTENDED <br /> PERIOD OF DM SHOULD BE COVERED WITH A DURABLE REINFORCED PLASTIC <br /> STRUCTURAL FILL YEAR ROUND. MEMBRANE DURING CONSTRUCTION TO PREVENT SLOPE RAVELING MID RUTTING <br /> FILTER FABRIC LINER UNDER ROCK DURING PERIODS OF PRECIPITATION. <br /> I RIP RAP PAD SHALL BE TWICE THE WIDTH OF THE PIPE. 7. GRANULAR SOIL IMPORTED FOR USE AS STRUCTURAL FILL SHALL MEET THE �-1.y���� <br /> REQUIREMENTS BELOW: 14.ALL PERMANENT?DlR'Al10 FILL SLOPES SHALL BE GRADE°WITH A FINISH <br /> INCLINATION OF NO GREATER THAT 2:1. UPON COMPLETION OF GRADING,THE <br /> RIP RAP PAD DETAIL U.S.SIEVE SIZE PERCENT�ASSING SLOPE FACE SHOULD BE APPROPRIATELY VEGETATED OR PROVIDED WITH OTHER <br /> N.1.S. 6 INCHES PHYSICAL MEANS TO GUARD AGAINST EROSION. FINAL GRADES AT THE TOP OF THE <br /> NO.4 75 MAXIMUM SLOPE MUST PROMOTE SURFACE DRAINAGE AWAY FROM THE SLOPE CREST. WATER <br /> NO. 200 5 MAXIMUM/ RUST NOT BE ALLOWED TO FLOW UNCONTROLLED OVER THE SLOPE FACE. <br /> I ___ i 44`S 'BASED ON THE 3/4-INCH FRACTION 15. ALL FILL PLACED FOR EMBANKMENT CONSTRUCTION SHOULD MEET THE STRUCTURAL <br /> fl-FeFILL REQUIREMENTS USTED UNDER NOTE 17. IN ADDITION,WHERE NEW FILLS ARE <br /> ND - PLACED OVER EXISTING SLOPES OF 20 PERCENT OR GREATER,THE STRUCTURAL <br /> T- I - FILL SHOULD BE KEYED AND BENCHED INTO COMPETENT NATIVE SOILS.(SEE <br /> I n GENERALIZED SLOPE FILL DETAIL SHEET C9) <br /> RI.G I '-440 16.AT A MINIMUM,A TOE DRNLI,DAYLIGHTED AT EACH END,SHALL BE INSTALLED IN <br /> kONU oIwU1' THE KEY CUT AS SHOWN ON THE DETAIL ON SHEET C9. DEPENDING ON SEEPAGE <br /> ____i_ . <br /> AR-SECTION--LINE CONDITIONS,DRAINS MAY ALSO BE REQUIRED ALONG INOMDUAL BENCHES <br /> 6-HL,M__- EXCAVATED ON THE SLOPE FACE. THE GEOTECHNICAL ENGINEER SHOULD BE <br /> ! I I 1 _ PRESENT AT THE SITE DURING BENCHING OPERATIONS TO DETERMINE IF ADDITIONAL <br /> I}F 435 DRAINS HILL BE REQUIRED. <br /> Ih`' 445 —__ <br /> f \ _ _PROPOSD-STORO DETTERT '-P LONONQ__� -- <br /> `T I I -M <br /> I ._ I6.-T0P-OF-PONTIL EL,9 <br /> Shwt- C6 of t2_ <br /> a �� <br />