My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 5/15/2019
>
Contracts
>
6 Years Then Destroy
>
2020
>
TranTech Engineering LLC 5/15/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:30 AM
Creation date
6/4/2019 10:27:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
5/15/2019
Council Approval Date
5/1/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Design of Maple Heights Seismic Retrofit
Tracking Number
0001812
Total Compensation
$267,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 4/15/2020 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY <br /> Local Agency A&E Professional Services <br /> Cost Plus Fixed Fee Consultant Agreement <br /> Agreement Number: <br /> Firm/Organization Legal Name (do not use dba's): <br /> TranTech Engineering, LLC <br /> Address Federal Aid Number <br /> 365 - 118th Ave SE - #100 BHM-2776(008) <br /> UBI Number Federal TIN or SSN Number <br /> 602507862 68-0607809 <br /> Execution Date Completion Date <br /> 12/31/2020 <br /> 1099 Form Required Federal Participation <br /> 0 Yes n No n Yes n No <br /> Project Title <br /> Maple Heights Bridge Seismic Retrofit <br /> Description of Work <br /> The Maple Heights Bridge was constructed in 1979 in an area of Snohomish County that is now the south end <br /> of the City of Everett and just north of the City of Mukilteo. The 3-span bridge is approximately 51 feet wide <br /> out-to-out and 303 feet long (97.5':110':95.5'). Its superstructure is composed of reinforced concrete <br /> pre-stressed girders made composite with a 7.5"thick concrete deck slab. Its substructure is composed of <br /> concrete abutments and multi-column intermediate piers founded on shallow spread footing foundations. The <br /> bridge carries two lanes of traffic with a 5' wide sidewalk on each side. The project entails seismic retrofit of the <br /> bridge to survive the AASHTO's 1000-year return sesimic event. <br /> All work will be performed per current WSDOT,AASHTO and City of Everett standards and guidelines <br /> ❑ Yes n No DBE Participation Total Amount Authorized: 243,925 <br /> ❑ Yes I I No MBE Participation Management Reserve Fund: 24,000 <br /> ❑ Yes ❑ No WBE Participation <br /> Maximum Amount Payable: 267,925 <br /> ❑ Yes ❑ No SBE Participation <br /> Index of Exhibits <br /> Exhibit A Scope of Work <br /> Exhibit B DBE Participation/SBE Plan <br /> Exhibit C Preparation and Delivery of Electronic Engineering and Other Data <br /> Exhibit D Prime Consultant Cost Computations <br /> Exhibit E Sub-consultant Cost Computations <br /> Exhibit F Title VI Assurances <br /> Exhibit G Certification Documents <br /> Exhibit H Liability Insurance Increase <br /> Exhibit I Alleged Consultant Design Error Procedures <br /> Exhibit J Consultant Claim Procedures <br /> Agreement Number: <br /> Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Page 1 of 14 <br /> Revised 11101/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.