My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 4/15/2020 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2023
>
TranTech Engineering LLC 4/15/2020 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:29 AM
Creation date
4/22/2020 9:51:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
4/15/2020
Council Approval Date
4/1/2020
End Date
12/31/2023
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Seismic Retrofit Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0001812
Total Compensation
$32,212.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 5/15/2019
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
701 Washington State C4Ty <br /> Department of Transportation <br /> Supplemental Agreement Organization and Address <br /> Number I Gael Fisk,PE <br /> Original Agreement Number City of Everett Public Works Department <br /> 3200 Cedar Street,Everett,WA 98201 <br /> Phone: 425.257.8909 <br /> Project Number Execution Date Completion Date <br /> BHM-2776(008) 5/1 6/2019 12/31/2020 <br /> Project Title New Maximum Amount Payable <br /> Maple Heights Bridge Seismic Retrofit $322,102 <br /> Description of Work <br /> The project entails seismic retrofit of the Maple Heights Bridge to survive the AASHTO's 1000-year return seismic event. <br /> The additional work is to provide Construction Phase Engineering Services. <br /> The Local Agency of City of Everett <br /> desires to supplement the agreement entered in to with TranTech,Engineering LLC <br /> and executed on 5-16-19 and identified as Agreement No. <br /> All provisions in the basic agreement remain in effect except as expressly modified by this supplement. <br /> The changes to the agreement are described as follows: <br /> Section 1, SCOPE OF WORK, is hereby changed to read: <br /> See Exhibit A Attachment for additional scope of work which include Construction Phase Engineering Services. <br /> I I <br /> Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days <br /> for completion of the work to read: 12/31/2023 <br /> III <br /> Section V, PAYMENT, shall be amended as follows: <br /> Construction Phase Engineering Management Services shall be authorized for a total of$54,177 as detailed in the attached Exhibit <br /> B.The new maximum amount payable is$322,102. <br /> as set forth in the attached Exhibit A, and by this reference made a part of this supplement. <br /> If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate <br /> spaces below'^�t^ By: <br /> and return to this offic for final action. <br /> By: <br /> r <br /> Co ant Signatur uthori attire <br /> 47/(01aV67----A <br /> DOT Form 140-063 <br /> Revised 09/2005 <br /> City erk <br />
The URL can be used to link to this page
Your browser does not support the video tag.