My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 5/15/2019
>
Contracts
>
6 Years Then Destroy
>
2020
>
TranTech Engineering LLC 5/15/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:30 AM
Creation date
6/4/2019 10:27:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
5/15/2019
Council Approval Date
5/1/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Design of Maple Heights Seismic Retrofit
Tracking Number
0001812
Total Compensation
$267,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 4/15/2020 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit E-Sub-consultant Cost Computations <br /> Consultant Fee Determination <br /> Maple Heights Bridge Seismic Retrofit Project <br /> Work Element 6-Traffic(Gibson) <br /> Edward Brad Zach Maya <br /> Koltonowski Lincoln,PE Wieben,PE McLain Total <br /> Project Principal/ <br /> Manager Project Engineer Engineer Clerical <br /> Project Coordination 10 5 <br /> City of Everett Meeting(s) 2 2 <br /> Neighborhood Meeting(s) 3 3 <br /> Draft Traffic Control Plan 1 7 2 <br /> Traffic Control Plan Drafting Coordination 3 <br /> Final Traffic Control Plan 1 3 1 <br /> Internal QA/QC 1 2 <br /> Neighborhood Traffic Analysis 10 15 <br /> Contract/Invoicing/Etc. 2 <br /> Total Staff Hours 28 38 5 2 73 <br /> Direct Rates $101.41 $76.06 $36.50 $30.00 <br /> Total Direct Salary Cost $2,839 $2,890 $183 $60 $5,972 <br /> Total Labor Cost $5,972 <br /> OH at 110.00%of Direct Labor $6,569 <br /> Profit at 27.05%of Direct Labor $1,615 <br /> Total $14,157 <br /> Direct Costs(Mileage,Reproduction,Data Collection,etc.) $750 <br /> Data Collection for Neighborhood Analysis $1,000 <br /> Grand Total: $15,907 <br /> 3/24/2019 Page 5 of 5 WE 6 Traffic <br />
The URL can be used to link to this page
Your browser does not support the video tag.