Laserfiche WebLink
_t ' <br /> 52nd St SE 5. 3 nd St St m <br /> a Main St <br /> e Harbor Freight Tools a S I <br /> .v a <br /> c..? <br /> <'p G <br /> • <br /> i LenOr(3.rt <br /> E <br /> • PROJECT SITE ; a3 " <br /> Creek side Mobile ,� v <br /> :u _ <br /> Home Park`� c fia,,.. <br /> Z 4 <br /> '_ Euth Si SE .c <br /> h <br /> 7.7 61st S:SE <br /> Pecks Ur a 4a, <br /> 62nd St SC d 62nd'St SE <br /> - 6 Value Village Thrift Store - m <br /> 0 F <br /> r.' 6, dSiSr Q <br /> o <br /> '. O C, <br /> t k <br /> d Lexington ave <br /> 4 Q` S N Melvin Ave <br /> o <br /> C b 3 <br /> M G�� a rs PinelnrstAve LI <br /> o. <br /> Atden PI < <br /> II. Site Assessment: <br /> The project site was developed with a single family house and several storage sheds. All but one storage shed have <br /> been'cnioved.Existing vegetation consists of low brush,grass,trees and bushes.The site is accessed from Highway <br /> Place by gravel driveway. <br /> The site generally slopes to the northwest at approximately 5%and contains no wetlands,creeks or streams.The site <br /> is within a neighborhood that consists of both multi-family and single family homes.There is a nominal amount of <br /> tributary r uioffentering the site from the east. Existing storm flows sheetflow over the site toward an existing storm system <br /> on Highway Place. Similarly,the developed stone runofffinm the entire site will flow toward onsite detention tank and <br /> released to an existing storm system on Highway Place. <br /> Review of all available information:Conducted site review and reviewed available information from the City of Everett and <br /> Snohomish County mapping system and found no critical areas,erosion or landslide hazard areas within quarter mile of the <br /> project site. Also,there are no streams,wetland or flood areas.Also there are no water quality issues has been identified <br /> The soil hydrologic types for this site have been identified as Type C from the Snohomish County <br /> Soil Survey Map. This soil, Alderwood Urban Complex, this soil is moderately deep and moderately <br /> well drained over hardpan. <br /> III. Site Development Plan w/On-Site Stormwater Management: <br /> The project proposes to manage stormwater runoff on site to the maximum extent. Flows from building's <br /> rooftops will be collected and directed to a detention tank. <br />