PUBLIC WORKS PROJECTS UNDER CONSTRUCTION <br /> SIGNATURE C=COUNCIL % <br /> PROJECT CONTRACTOR BID DATE ONLY IF CO CHANGE ORDER PLUS APPROVAL CHANGE COST TO DATE NOTES <br /> TOTAL IS ORIGINAL BIDS&TAX M=MAYOR ORDER (INCL WSST) <br /> UNDER: SIGNATURE OF BID <br /> WEST MARINE VIEW DRIVE KLB CONSTRUCTION,INC. 9/25/2018 Contractor has completed final paving of all trenches where <br /> UTILITIES combined sewer,storm sewer and sewer force main pipes <br /> PO BOX 158 CO#2 $0.00 0.0% were installed.Project substantially complete,punch list <br /> Mukilteo,WA 98275-0158 CO#1 $0.00 0.0% work is ongoing. <br /> $212,922.73 CO TOTAL $0.00 <br /> BASE BID PRICE $1,379,227.25 <br /> TOTAL CONTRACT $1,379,227.25 $703,832.38 <br /> WSST $0.00 - <br /> TOTAL COST $1,379,227.25 $703,832.38 <br /> NORTH WETMORE THOMCO CONSTRUCTION,IN 3/13/2018 I Work is substantially complete,contractor is working on <br /> STORMWATER punch list work. A small deductive change order#1 has <br /> SEPARATION 13700-44th STREET NE been written to add a roadway excavation including haul <br /> LAKE STEVENS,WA 98258 item,add tons of HMA for permanent trench patch and <br /> -delete bid items for planing bituminous pavement and HMA <br /> CO#2 for overlaying with asphalt,the intersections along Wetmore <br /> CO#1 0.0% Avenue from 5th to 11th Streets. <br /> $414,578.87 CO TOTAL $0.00 <br /> BASE BID PRICE $3,395,788.65 <br /> TOTAL CONTRACT $3,395,788.65 <br /> WSST $0.00 - <br /> TOTAL COST $3,395,788.65 $3,165,369.54 <br /> PROCESS WATER PUMP STELLAR J.CORPORATION 7/3/2018 New pump skid has been delivered. Final coordination to <br /> STATION complete new pump system is underway with start-up before <br /> 1363 DOWN RIVER DRIVE CO#2 the end of May. A new pump priming system is also being <br /> WOODLAND, WA 98674 CO#1 0.0% acquired for the pump system,which is said to be more <br /> effective and efficient,than what was called for in the <br /> $150,775.00 CO TOTAL $0.00 designed. This will be added to the contract by future <br /> BASE BID PRICE $838,500.00 $574,055.93 change order#1 in the amount of$38,750.This new priming <br /> WSST $69,595.50 $47,646.64 system is anticipated to arrive by June 10th.Project is <br /> roughly 95%complete. <br /> TOTAL COST $908,095.50 - $621,702.57 <br /> Page 1 <br />