Laserfiche WebLink
• <br /> PUBLIC WORKS PROJECTS UNDER CONSTRUCTION <br /> SIGNATURE C=COUNCIL % <br /> PROJECT CONTRACTOR BID DATE ONLY IF CO CHANGE ORDER PLUS APPROVAL CHANGE COST TO DATE NOTES <br /> TOTAL IS ORIGINAL BIDS&TAX M=MAYOR ORDER (INCL WSST) <br /> UNDER: SIGNATURE OF BID <br /> WETMORE STORMWATERINTERWEST CONSTRUCTION 7/27/2018 Awaiting all paperwork required to forward this project to <br /> BYPASS IMPROVEMENTS Council for Final Acceptance. <br /> 609 NORTH HILL BOULEVARD CO#3 $9,660.00 C 1.4% <br /> BURLINGTON WA 98233 CO#2 $126,002.50 C 18.5% <br /> CO#1 $38,600.00 M 5.7% <br /> $127,254.40 CO TOTAL $174,262.50 <br /> BASE BID PRICE $681,696.00 <br /> TOTAL CONTRACT $855,958.50 <br /> WSST <br /> TOTAL COST $855,958.50 $855,514.18 <br /> LEGION GOLF COURSE RODARTE CONST,INC 1/9/2018 This project is substantially complete. Architect visited <br /> STORMWATER DETENTION Legion Park site on May 1st and generated additional punch <br /> 17 EAST VALLEY HYWAY E. list items which the contractor is working on during the week <br /> AUBURN,WA 98092 CO#2 of May 13th,2019. This additional punch list work will <br /> generate the need for a second change order,anticipated in <br /> CO#1 $235,330.75 the range of$30K-$40K. <br /> $451,005.83 CO TOTAL $235,330.75 <br /> BASE BID PRICE $3,760,058.25 <br /> TOTAL CONTRACT $3,995,389.00 $3,945,452.89 <br /> WSST $0.00 - <br /> TOTAL COST $3 995,389.00 $3,945,452.89 <br /> WATERMAIN SRV CONSTRUCTION,INC. 12/18/2018 Contract work is nearing physical completion. Once punch <br /> REPLACEMENT"Q"- list is completed a final estimate will be prepared and <br /> EVERGREEN WAY REBID 2920 NORTH HELLER ROAD forwarded to Contractor for review and execution. Months <br /> OAK HARBOR,WA 98277 CO#1 $180,445.32 398.1% ago,the Contractor put the City on notice that it believed that <br /> completing work on this project during the night shift would <br /> CO TOTAL $180,445.32 cause additional costs. So far,they have yet to provide that <br /> $225,671.83 BASE BID Sch A $1,461,393.32 additional cost information. By sending them a final <br /> estimate they will either sign it,agreeing to dollars owed <br /> BASE BID Sch B $45,325.00 them,or provide their additional cost information claimed, <br /> BASE BID TOTAL $1,506,718.32 1,474,640.42 via their earlier notice letter. <br /> WSST Sch A ONLY $141,755.15 139,225.69 <br /> TOTAL BASE BID $1,648,473.47 <br /> TOTAL Incl.CO's $1,828,918.79 $1,613,866.11 <br /> .JC) <br /> Page 2 <br />