Laserfiche WebLink
PUBLIC WORKS PROJECTS UNDER CONSTRUCTION <br /> SIGNATURE C=COUNCIL % <br /> PROJECT CONTRACTOR BID DATE ONLY IF CO CHANGE ORDER PLUS APPROVAL CHANGE COST TO DATE NOTES <br /> TOTAL IS ORIGINAL BIDS&TAX M=MAYOR ORDER (INCL WSST) <br /> UNDER: SIGNATURE OF BID <br /> WATERMAIN INTERWEST CONST,INC. 11/13/2018 $0.00 Project is physically completed. Awaiting final costs to be <br /> REPLACEMENT"T" known before writing future change order#2. It is <br /> 609 NORTH HILL BOULEVARD CO#2 anticipated that change order#2 will be something on the <br /> BURLINGTON,WA 98233 CO#1 $34,740.00 M 1.8% order of$35K. <br /> $267,482.60 CO TOTAL $34,740.00 <br /> BASE BID Sch A $1,875,306.00 <br /> BASE BID Sch B $49,520.00 <br /> BASE BID PRICE $1,924,826.00 $1,660,819.76 <br /> WSST Sch A ONLY $181,904.68 $161,099.52 <br /> TOTAL BASE BID $2,106,730.68 <br /> TOTAL Incl.CO's $2,141,470.68 $1,821,919.28 <br /> ALVERSON STORMWATER RODARTE CONST,INC 3/19/2019 Notice to proceed was issued for Monday,May 13,2019. <br /> SEPARATION PROJECT <br /> 17 EAST VALLEY HYWAY E. CO#2 0.0% <br /> AUBURN,WA 98092 CO#1 0.0% <br /> $221,018.20 CO TOTAL <br /> BASE BID PRICE $1,460,182.00 $0.00 <br /> WSST,NO TAX $0.00 $0.00 <br /> TOTAL COST $1,460,182.00 $0.00 <br /> 'Vv <br /> Page 5 <br />