My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/06/02 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/06/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2019 9:18:57 AM
Creation date
6/6/2019 9:18:26 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/2/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> PUBLIC WORKS PROJECTS UNDER CONSTRUCTION <br /> SIGNATURE C=COUNCIL % <br /> PROJECT CONTRACTOR BID DATE ONLY IF CO CHANGE ORDER PLUS APPROVAL CHANGE COST TO DATE NOTES <br /> TOTAL IS ORIGINAL BIDS&TAX M=MAYOR ORDER (INCL WSST) <br /> UNDER: SIGNATURE OF BID <br /> WPCF FEN CHLORINATIONIMCO GENERAL CONST 9/11/2018 CO#3 IMCO has just completed the one remaining section of box <br /> BUILDING UPGRADE culvert,base slab,on 5-14-19. IMCO has completed <br /> 2116 BUCHANAN LOOP CO#2 permanent piling for new chlorine building foundation. <br /> FERNDALE,WA 98248 CO#1 Dutton Electric is working on their conduit layout runs for <br /> underneath the new chlorine building foundation slab. Once <br /> $677,494.00 CO TOTAL $0.00 this is completed IMCO can pour new building foundation <br /> BASE BID PRICE $7,049,880.00 slab. <br /> TOTAL CONTRACT $7,049,880.00 2,349,964.20 <br /> WSST $683,838.36 227,946.53 <br /> TOTAL COST $7,733,718.36 $2,577,910.73 <br /> GRAND AVENUE PARK INTERWEST CONST,INC. 6/8/2017 Contractor is continuing to work on installation of the <br /> BRIDGE elevator in the west tower abutment.Contractor continues to <br /> 609 NORTH HILL BOULEVARD CO#12 $0.00 M receive shipments of structural steel pieces and construct <br /> BURLINGTON,WA 98233 CO#11 $6,987.25 M 0.1% the new pedestrian bridge on the west side of WMVD. <br /> Contractor has provided information to the City of the <br /> CO#10 $135,096.44 M 1.0% various alternatives they considered to be able to set the <br /> CO#9 $24,994.89 M 0.2% bridge. Thus far using a transport method to jack up and <br /> CO#8 $6,934.32 M 0.1% mobilize the bridge is what is most viable and will require a <br /> 10-day shutdown of WMVD. Meetings with City of Everett <br /> CO#7 $0.00 M and BNSF are being held to discuss timing of bridge <br /> CO#6 $0.00 M placement. <br /> CO#5 $15,477.91 M 0.1% <br /> CO#4 $0.00 M <br /> CO#3 -$9,382.93 M -0.1% <br /> CO#2 $28,000.00 M 0.2% <br /> CO#1 $0.00 M <br /> $1,014,471.93 CO TOTAL $208,107.88 1.5% <br /> BASE BID PRICE $13,789,438.50 <br /> TOTAL CONTRACT $13,997,546.38 $8,874,900.95 <br /> WSST $0.00 _ <br /> TOTAL COST $13,997,546.38 $8,874,900.95 <br /> D <br /> Page 4 <br />